My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2026 10:13:01 PM
Creation date
1/6/2025 4:11:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0505264
PE
2361 - UST FACILITY
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1501 N JACK TONE RD RIPON 95366
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SA J O A O I I I N Environmental Health Department <br /> UST SYSTEM RETROFIT OR REPAIR <br /> ( tibmit min imUM of 3 sets of plans &applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES [4 NO 11 <br /> , Subrnit copies of ICC Service Technician and/or Installers certificate and all manufacturer training <br /> certificates for each person Installing or testing any component that is repaired or replaced. Ensure a copy of <br /> the"Site Health and Safety flan' is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed, List components to be repaired or replaced and atlach a <br /> diagram drawn to scale showing location of repairs and/or replacements. If repairing a component, describe <br /> how this will be done. (If addir<a piping. UDC's, or other UST equipment, or performing tank top upgrede, <br /> use the UST Installation Application pages 4-8 as necessary for a timely plan review): <br /> -Reseal the existing NOV Sio-Diesel out penetration at Gio-Diesel shad sump using NOV PS X34 Adhesive <br /> kit. <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> NOV - PSX34 -Adhesive lit <br /> �5`Be nation Procedures: <br /> a_ Will piping inated prior to removal? YES I I NO[1 <br /> b. Identlfy contractor perform ng anon: <br /> Name ne _ <br /> Address city <br /> a ors <br />
The URL can be used to link to this page
Your browser does not support the video tag.