My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2026 10:13:01 PM
Creation date
1/6/2025 4:11:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0505264
PE
2361 - UST FACILITY
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1501 N JACK TONE RD RIPON 95366
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ❑ Proffassionat Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used. <br /> Tank ID <br /> Tank Manufacturer <br /> Teak Capacity <br /> Test Mart Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer 2 Industry Standard ❑ Professional Engineer <br /> Test Type 10 Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used. Pressure Gauges ! Nitrogen <br /> Pipe Run ID 87 Product 91 Product T6 Auto Diesel T1 RV Diesel & 19-20 <br /> Pipe Manufacturer Smith J NOV Smith f NOV Smith ! NOVSmith i NOV <br /> Test Start Time 8:00am 8:00am 8:00am 8:00am <br /> Initial Pleading 5 Psi 5 Psi 5 Psi 5 Psi <br /> Test End Time 9:00arn 9:00am 9:00am 9:00am <br /> Final Reading ,5 Psi 5 Psi 5 Psi 5 Psi <br /> Change in Reading 10 psi 0 Psi 0 Psi 10 psi <br /> PasslFail Criteria 'Pass Pass Pass Pass <br /> Tightness Test Results El Pass ❑ Fail 2 Pass ❑ Fail ® Pass ❑ Fail 2 Pass ❑ Fail <br /> Pipe Runt ID iT2 6lodlesel Prod T3 6lodlesel Prod Diesel Syphons ,Blo Vacuum chase <br /> Pipe Manufacturer Smith 1 NOVSmith J NOV Smith 1 NOV 15mith 1 NO <br /> Test Mark Time 9:10am 9:10am 9:10am 9:10am <br /> Initial Reading 5 Psi 5 Psi 5 Psi 5 Psi <br /> Test End Time 10:10am 10:10am 10:10am 10:10am <br /> Final Reading 5 Psi 5 Psi 5 psi 5 Psi <br /> Change in Reading 0 Psi 0 Psi 0 Psi 0 psi <br /> Pass/FailCriteria Pass Pass Pass Pass <br /> Tightness Test Results . B Pass ❑ Fail 1 [0 Pass ❑ Fall 52 Pass El Fail 1 2 Pass Cl Fail <br /> Additional copies of this page may be attached. <br /> ,ill tests marked "i=arl"and any repairs ins de before or during the tightness test in List be described in <br /> the COMMENTS section. <br /> Page 2of <br />
The URL can be used to link to this page
Your browser does not support the video tag.