My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2026 10:13:01 PM
Creation date
1/6/2025 4:11:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0505264
PE
2361 - UST FACILITY
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1501 N JACK TONE RD RIPON 95366
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Recommended Practices for the Testing and Verification of Spill,Overfill,Leak Detection and Secondary Containment Equipment at UST Facilities <br /> tank is no more than 95 percent full, the automatic 7.2.3 Inspection Equipment. Test equipment <br /> shutoff device passes the inspection. shall include: <br /> If the automatic shutoff device does not function • equipment to remove the vent restriction device; <br /> as designed or complete shutoff of product flow • tape measure. <br /> is unable to occur until the tank is more than 95 <br /> percent full, the automatic shutoff device fails the 7.2.4 Description of Inspection. The ball float <br /> inspection. valve assembly is removed from the tank, inspect- <br /> ed for proper operation and measured to ensure that <br /> 7.2 Ball Float Vales. The PEI Overfill, Release the ball float assembly is the proper dimension to <br /> Detection and Release Prevention Equipment Testing restrict flow into the tank when it is no more than <br /> Committee recommends that ball floats be removed from 90 percent full. <br /> USTs as overfill prevention devices and another method <br /> of overfill prevention be installed. 7.2.5 Preparation. Refer to the manufacturer's <br /> tank chart for the capacity in gallons, the diameter <br /> 7.2.1. General. Ball float valves are designed and the volume of product with respect to product <br /> to restrict product flow when product in the tank level. <br /> reaches a certain level by restricting vapor flow <br /> from the tank ullage.When vapor flow is restricted, Use this test procedure in conjunction with the man- <br /> pressure builds in the tank ullage,slowing the flow ufacturer's installation and maintenance instruc- <br /> of product into the tank. tions. <br /> To operate properly, the ball float valve must be Visually verify that all tank-tap fittings are leak- <br /> properly installed, positioned at the correct height free and vapor-tight before starting the test proce- <br /> inside the tank and compatible with UST configu- dure. If any fittings arc loose, the ball float valve <br /> ration. will not restrict flow. <br /> 7.2.2 Purpose. The purpose of this inspection is Inspect the drop tube to ensure that it does not have <br /> to verify that the ball float valve is installed prop- an overfill valve. <br /> erly,operates as designed,and is set to restrict flow <br /> when the tank is no more than 90 percent full. 7.2.6 Inspection Procedure. <br /> "� 1.Remove the ball float valve assembly from the <br /> � w24 <br /> z n tank. <br /> 2.Visually inspect the ball float and cage.Remove <br /> any debris or foreign objects. <br /> .:at#:ai <br /> qr 3 ` -s, ¢ t Viz- r r r� i h t�S>�f" [ 1 ✓i,'. �i" 3 <br /> " .y' <br /> IN <br /> E'1� kkll <br /> r , <br /> r x " <br /> 4 7r M s�.�" .- °"" { a ..uc.�^3' ai^ . a n'f`r ,y�� 7M 3 z" <br /> MF <br /> FIGURE 7-2. Ball float assembly showing the ball in the FIGURE 7-3. To avoid damage when removing or rein- <br /> open position. The ball will float and cover the vapor stalling the ball float, use an extractor tool recommend- <br /> path if the product rises above the level of the cage. ed by the bail float manufacturer. <br /> pei.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.