Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: 07/14/2025 <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> lig� w (Monitoring Plan Site Map <br /> Drawing NOT to Scale <br /> Vent Sump <br /> wl Sensor(1-3) AT&T building <br /> 794380-208 <br /> Annular Sensor <br /> (L1)794390420 TLS 350 Plus <br /> dj (1st Floor) <br /> > - - Engine Piping Tray <br /> < u► ( I Sensor(L5) <br /> > oI I _ � 794390-42D <br /> I (Overfill <br /> (j c)�, Ln i _ Alarm ' ~� <br /> r 1 Fuel Transition Sump <br /> Lines wl Sensor(1-4) <br /> 7943a0-208 <br /> Fill I Piping Sump <br /> wl Sensor(L2) <br /> 7943a0-208 <br /> Spill Bucket <br /> ATG <br /> Page 6 of 6 <br />