My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4733
>
2300 - Underground Storage Tank Program
>
PR0232510
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2026 9:34:08 PM
Creation date
1/15/2025 8:52:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0232510
PE
2361 - UST FACILITY
FACILITY_ID
FA0003924
FACILITY_NAME
HUNT & SONS INC - STOCKTON
STREET_NUMBER
4733
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95206
APN
17930008
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4733 S STATE ROUTE 99 STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 7. LINE LEAK DETECTOR TESTING <br /> ❑ Check this box if line Ieak detectors ARE NOT installed. (Do not complete this section.) <br /> imu ated release rate verified; (Check all that apply ) Yes No N <br /> .3 GPH ❑ U GPH 110.2 GPH <br /> Has the testing apparatus been properly calibrated? "t ❑ CI <br /> For emergency generator tank systems, does the LLD create an audible and visual ❑ ❑ <br /> alarm when a leak is detected? <br /> For mechanical LLDs, does the LLD restrkct the flow through the pipe when a ❑ ❑ <br /> release is detected? <br /> For electronic LLDs, does the turbine automatically shut off when a release is ❑ ❑ <br /> detected? <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the ❑ ❑ <br /> monitoring s tem is disabled or disconnected? <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the ❑ o <br /> mon[tod V s stem malfunctions or fails a tightness test? <br /> For electronic LLDs, have all accessible wiring connections been visually inspected © ❑ <br /> for kinks and breaks? <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑ <br /> Were all LI-Ds confirmed operational within regulatory requirements? ❑ <br /> LLD ID LLD Model Lines Monitored Pass Fail <br /> gej <br /> El c- <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> El ❑ <br /> Describe a#answers marked "No"or "Far!" and proposed remedy in Section 9_ <br /> List all monitoring equipment either repfaced or repaired in Section 9 <br /> Page 4 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.