Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared:1/13/2025 <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> Site Address: KWIK SERVE 420 KETTLEMAN LAME LQDI CA 95240 <br /> KEY ALuy itegus underground that are not risible to the certifying tP-hmcun are a . . . . . . . . <br /> A=xvut LkK Sensor professional oparron only and are solely for mfioanatiooal purposes. Draw-ing net c . . . . . . . . . <br /> F=FILLS stale- <br /> v VAPOR <br /> P=FROB£ <br /> L=Turbine 1 L esk Detector B. .— <br /> k=SUMP SENSOR � — � 3 <br /> S=]Brine Sensor 5.� <br /> S=Smart Sensor — — <br /> C=Flaars&tyILains . . . . . . . . . . . . . - . . . . <br /> E=E Stop <br /> . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . <br /> F F <br /> Diesel $7 <br /> 4 <br /> a ; xLP <br /> . - . T <br /> . . . . . . . . . . <br /> . . . . . . . . . . . . . . . <br /> 1� . . . . . . . . . . . <br /> - - iao si <br /> . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . _ . . . . - - . . <br /> WA RrF OIL. -VENTS - <br /> *PDnI`G} <br /> (ARROWS) <br /> Ehma mg of piping <br /> exit of sump and . . . . . . . . <br /> UDC's.'_rwn . . . . . . . . <br /> ,nadeggraund . . _ . . . . _ _ <br /> dranvmg L°acv=ate. { CAS= <br /> spec elate blue - . . . . . . . - . . . . -. <br /> Date map was drawn:4a 101 <br /> Inskucfians <br /> If you already have a diagram that shows all required information,you may include it rather than this page,with your Monitoring System Certification. On your sFte plan, <br /> show the general layout of tanks and piping. Clearty identify locations of the fallowing equipment,if installed:monitoring system aonUol panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill 000tainers,or other secondary containment areas;mechanical or eledronn line leak detectors;and in-tank liquid level <br /> probes{ff used for feak deteetian). In the space provided,notethe date this Site Plan was prepared. <br /> Page 6 of 6 <br />