Laserfiche WebLink
•a f <br /> ANSTP&LAT1®NI NO S DO NOT REMOVE <br /> r � 1 <br /> ABOVEGROUND TANK FOR 0 SEL FUEL 1 — • <br /> Type:IndooflAtmmes�jItherfc-do gat 090-W40 <br /> Ratted Capacity: U.S.OaR9rl 3 ° • <br /> Material: 90as steel • • - <br /> This tank has been factory pre ura tested at S PSI WARRING:A dangerous install ai It will result it property si2ai oveffiow and vent pipss <br /> are not connected te'this tank. ,i <br /> OVERFLOW:Should tank be overfi it as a result of misadjgsimebt of fuel level controls, <br /> suet spill ge or overpressutl2ation 1 the tank lost,result.An overflow pipe back to the <br /> Alain slf ge tank of at leas)doubt,the site of the fill pipe(from the pumpkin ust be in- <br /> slotted with consideration given to englh of run and vertical drop.(Use Min.1"I.O.) <br /> r VENT:A properly sized and iaatalle vent pipe is mandatory.The vent provides a means <br /> lox tank to breal(m when fuel is with wo or addedlo tank.Ventsp&g also provides pressure <br /> mian or gassificalion of Bcatents in event at Net: <br /> rs1iM in case of aveAill or rapid ex <br /> Porltans of this lank may become Pe d gently maximum withstand Pressure edk25 Pove 5 Sa-To avoi slid d <br /> ruplureat pressures above the desho p <br /> in Phare(outside of the <br /> anethe tMrea�d vent IIMnp inlslal�ed jn the tank must be provided to extendminimum tof <br /> mesa than 12 lt, d EXTEND or TERMINATE <br /> obeve svchis r,110 Tha(e must be no lowo on of this veal Pport enls or a art n the yof inso Pe <br /> jj.�j Iswhich can trap liquid.Protect the ope�t end by suitable means to Prevent entry of insects, <br /> foreign matter and precipitation. <br /> NOTE:The emergency vent line capacity specified ontile aPtafJrd at the top of this established by tank r <br /> mull be considered in order to mainteln the Itre safely alp <br /> 0116 ya tUL 142 NFPA SDaand is into d=ned toonform and c on st4eaardse o¢sarvancebnefit from ea'this <br /> rvatue Islman" <br /> datory.It <br /> may be necessary to increase The vent pipe diameter it the for 0age <br /> is long. <br /> MN Ys,an punt Inside and outsiide of lank.Promptly repair m tank at least since math six onths <br /> any SIXecantiy dama9e <br /> ed er delarhi tied lank. product'it most be <br /> NOTE:Tatied anan d maintaine Is d ey®ndWiduals equipped with the standards:training eand sxigs.� - <br /> ad,Ope standards: _ <br /> This took eontome,to applicable Poelians oWhe tollowina, <br /> LAFD <br /> NFPA 30 and NFPA 37 - <br /> IL 62702 <br /> UL 142 a 99 rafnBied. <br /> 6 � FAX 2Y752§79M <br /> off- =11 2525-5595(2•Hr.) <br /> �p 97 <br /> ife 20AN33n54 <br /> y 1• I <br /> .,Y., <br />