Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST (continued) <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ® Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> Test Equipment Used: Caldwell Level Change Indicator <br /> Sump/UDC ID UDC 11&12 UDC 13&14 UDC 15&16 UDC16S&17S <br /> Sump Manufacturer Bravo Bravo Bravo Bravo <br /> Sump Depth (inches) 8" 8" 9" 9" <br /> Sump Bottom to Top of BP BP BP BP <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 9:52 9:57 10:07 10:12 <br /> Initial Reading .001 .001 .001 .001 <br /> Test End Time 10:22 10:27 10:37 10:42 <br /> Final Reading .001 .001 .001 .001 <br /> Change in Reading 0 0 0 0 <br /> Lss/FailCriteria > .002 > .002 > .002 > .002 <br /> htness Test Results M Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Sump/UDC ID UDC 17&18 UDC18S&19S UDC 19&20 UDC 20S <br /> Sump Manufacturer Bravo Bravo Bravo Bravo <br /> Sump Depth (inches) 9" 9" 9" 9" <br /> Sump Bottom to Top of BP BP BP BP <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 10:17 10:22 10:27 10:32 <br /> Initial Reading .001 .001 .001 .001 <br /> Test End Time 10:47 10:52 10:57 11:02 <br /> Final Reading .001 .001 .001 .001 <br /> Change in Reading 0 0 0 0 <br /> Pass/Fail Criteria > .002 > .002 > .002 > .002 <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 4 of 5 <br />