Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> U ST Monitoring Site Plan <br /> s-------------------------------------------------------------------------—..-.---------------------------------------- <br /> Site Address: i Escalon Mini Mart Valero—1097 E Yosemite Avenue Escalon,CA 95320 <br /> . . . . . . . . . . . . . . . . . <br /> ❑ A=1MN ULAR <br /> F=FILLS <br /> T=TURBLNE <br /> ATG P=PROBE <br /> V=VAPOR <br /> . . . . . . %=SUI P SENSOR <br /> . . . . . . . . L=LeakIktector <br /> Y. . . . . . . X1='.lf2avay <br /> O. B=Brine Sensor <br /> S. I=Swart Sewer <br /> E. S=STP <br /> M. C=Roars&Chains <br /> E=E Stop <br /> T _ <br /> E. . . . . . . . . . . . . . . . . . <br /> 2. g g w <br /> . . . . . <br /> 8- x . . . . . . - x 8. . . . . . <br /> i <br /> i <br /> . . . . . . . . . . . . . . <br /> xPIPI N G <br /> (ARROWS) B <br /> DTa,.=g of pipmg <br /> exit Cf su.=sp and T>i <br /> UDC s.:Cc . . . . . . . . . . . <br /> und=TETamd .87 . . . . . <br /> i <br /> drairn-ie a rate * . _ . . . . . . <br /> ..n:3^-I]C: 'y . . . . . . . . . . . . . . . . . . <br /> specu:at=blue O - . - . . . . . . <br /> pr",U. - �� . . . . . . . . . . . . . <br /> 1 0 : : : : : <br /> _irb rrvm tarkrgrorad tharare not rfsrble to fix ceri ling tarhrrrefan a-e a <br /> rw4i--sional opnfosr oris•and—saly fo-nf*rrratfwal purprtsa Dr-dw <br /> mr to scde <br /> I <br /> Date map was drawn 12/1312017 <br /> Instructions <br /> If you already have a diagram that shows all required informatlon,you may kxlude it rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identity locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas:mechanical or electronic fine leak detectors;and in-tank liquid Level <br /> probes(N used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Page 6 of 6 <br />