My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1901
>
2900 - Site Mitigation Program
>
PR0548085
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2026 11:55:12 AM
Creation date
1/30/2025 12:25:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548085
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0027434
FACILITY_NAME
SINCLAIR DINO MART
STREET_NUMBER
1901
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
1901 S EL DORADO ST STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 4 <br /> WELL CONSTRUCTION SUMMARY <br /> QUICK-N-SAVE#1 <br /> 1901 South El Dorado Street <br /> Stockton,California 95206 <br /> Boring Bottom of Well Casing Boring Screen Top Of Bentonite Neat Cement <br /> Weell Installation Diameter Boring Depth Diameter Diameter Interval Sand Pack Interval Interval <br /> ID Date (inches) (ft-bgs) (feet) (inches) (inches) (ft-b s) (ft-bgs) (ft-bgs) (ft-bgs) <br /> Groundwater Monitoring Wells <br /> MW-1 3/16/2004 8 55 55 2 8 35-55 34 32-34 1-32 <br /> MW-2 3/17/2004 8 45 45 2 8 25-45 24 22-24 1-22 <br /> MW-3 3/16/2004 8 55 55 2 8 35-55 34 32-34 1-32 <br /> MW-4 3/17/2004 8 50 50 2 8 30-50 29 27-29 1-27 <br /> MW-5 6/8/2010 8 80 80 2 8 75-80 73 71-73 1-71 <br /> MW-6 6/8/2010 8 40 40 2 8 20-40 18 16-18 1-16 <br /> MW-7 6/9/2010 8 80 80 2 8 75-80 74 72-74 1-72 <br /> MW-8 6/9/2010 8 40 40 2 8 20-40 18 16-18 1-16 <br /> MW-9 6/10/2010 8 105 105 2 8 95-105 93 91-93 1-91 <br /> MW-10 6/11/2010 8 80 80 2 8 75-80 74 72-74 1-72 <br /> MW-12 5/26/2015 8 85 85 2 8 75-80 73 70-73 1-70 <br /> MW-13 5/27/2015 8 50 50 2 8 35-50 33 30-33 1-30 <br /> MW-14 6/2/2015 8 80 80 2 8 75-80 73 71-73 1-71 <br /> MW-15 5/29/2015 8 80 80 2 8 75-80 73 71-73 1-71 <br /> MW-16 9/20/2023 8 105 105 2 8 94.5-104.5 92 88.5-92 1-88.5 <br /> MW-17 9/21/2023 8 80 80 2 8 67-77 64 61-64 1-61 <br /> Remediation Wells <br /> EWl 8/17/2005 10 55 55 4 10 35-55 33 31-33 1-31 <br /> EW2 8/2/2010 10 40 40 4 10 15-40 13 11-13 1-11 <br /> EW3 8/2/2010 10 45 45 4 10 25-45 23 23-25 1-11 <br /> VW1 3/16/2005 8 35 35 2 8 15-35 13 11-13 1-11 <br /> VW2 3/16/2005 8 35 35 2 8 15-35 13 11-13 1-11 <br /> VW3 3/16/2005 8 35 35 2 8 15-35 13 11-13 1-11 <br /> VW4 3/16/2005 8 35 35 2 8 15-35 13 11-13 1-11 <br /> FREY Environmental,Inc. Table 4 Project No.1095-01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.