Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: 03/07/2025 <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> Monitoring Plan Site Map <br /> aW <br /> Drawing NOT to Scale <br /> E l f" St <br /> Fill Sump <br /> w/ Sensor(L2) <br /> Annular Sensor 794380-208 <br /> (L1)794390-420 Spill Bucket <br /> ATG <br /> i Piping Sump <br /> UE0580002 <br /> w/ Sensor(L3) <br /> AT&T Building 1 OK U ST Diesel 794380-208 m <br /> `� ——� \ Fuel Lines <br /> I ¢1 <br /> Vent Riser <br /> Overfill Alarm Gen Room <br /> Floor Sensor(L4) <br /> 794380-208 <br /> n w <br /> N TLS 350 Plus—, 1 o <br /> 0 <br /> U <br /> W E w c <br /> m � <br /> c C9 <br /> S °1 <br /> c <br /> w <br /> Page 6 of 6 <br />