My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON
>
1329
>
2300 - Underground Storage Tank Program
>
PR0231487
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2026 9:15:01 PM
Creation date
2/11/2025 1:06:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231487
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0000293
FACILITY_NAME
Pershing Holdings, Inc. DBA Escalon Arco
STREET_NUMBER
1329
STREET_NAME
ESCALON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
APN
22510003
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1329 ESCALON AVE ESCALON 95320
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A dOAQU1N Environmental Health Department <br /> COUNTY <br /> CP22 - UST FULL Inspection Report <br /> Facility Name: Facility Address: Date: <br /> PershingHoldings, Inc. DBA Escalon Arco 1329 ESCALON AVE ESCALON June 25 2025 <br /> To minimize person to person contact EHD is choosing to write the name of person receiving the report instead of <br /> having them sign. Starting July 1, 2024, all in-office CERS help will be provided at EHD hourly rate ($172). To <br /> schedule an appointment, please call (209)468-3420. <br /> ******************NOTES********************* <br /> The fill sump could not be verified at the time of inspection. The under dispenser containments (UDCs)and vent <br /> sumps are manufactured by Western Fiberglass; brine verification is required. Brine observed inside the UDCs <br /> appears to be blue to greenish-blue in color. <br /> Additionally, the caps for the brine reservoir are in need of replacement. During the inspection, the caps inside the <br /> vent sump and UDC 7/8 were observed to be brittle and deteriorating. <br /> Please be advised that any reinspection for the fill sump will be billed at the current Environmental Health Division <br /> (EHD) hourly rate of$172. <br /> If the reinspection is scheduled after July 1, 2025, the hourly rate will increase to $179. <br /> AFTER THE COMPLIANCE DATE, EHD WILL BILL FOR ALL TIME AND ACTIVITIES ASSOCIATED WITH BRINGING THIS <br /> FACILITY BACK INTO COMPLIANCE. <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> Received by: Date: June 25, 2025 Inspector: Inspector Phone: <br /> Printed Name and Title: Krlstlna Saetern, EHS (209)616-3045 <br /> Emailed to Satbir Dhanda, <br /> Manager <br /> FA0000293 PR0231487 SCO01 06/25/2025 <br /> EHD Rev.12/06/2021 Page 8 of 8 CP22-UST FULL OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.