Laserfiche WebLink
Jan 14 2025 2;35pm <br />CERS Consolidated Emergency Response / Contingency Plan <br />D <br />INTERNAL FACILITY EMERGENCY COMMUNICATIONS OR ALARM NOTIFICATION WILL OCCUR BY (Check all that apply): <br />CIL <br />❑ 1. VERBAL WARNINGS; ❑ 2. PUBLIC ADDRESS OR INTERCOM SYSTEM; ❑ 3. TELEPHONE; <br />❑ 4. PAGERS; ❑ 5. ALARM SYSTEM; ❑ 6. PORTABLE RADIO <br />NOTIFICATIONS TO NEIGHBORING FACILITIES THAT MAY BE AFFECTED BY AN OFF-SITE RELEASE WILL OCCUR BY (Check all that <br />apply): C12. <br />❑ I. VERBAL WARNINGS; ❑ 2. PUBLIC ADDRESS OR INTERCOM SYSTEM; ❑ 3. TELEPHONE, <br />❑ 4. PAGERS; ❑ 5. ALARM SYSTEM; ❑ 6. PORTABLE RADIO <br />EMERGENCY COORDINATOR CONTACT INFORMATION: <br />cls. <br />PRIMARY EMERGENCY COORDINATORNA-ME: PHONE NO.: PHONE NO.: <br />ALTERNATE EMERGENCY COORDINATOR NAME: PHONE NO.: PHONE NO.: <br />❑ Check if additional Emergency Coordinator contact and address information is available onsite or by calling PHONE NO.: <br />Note <br />If more than one alternate emergency coordinator is designated, attach a list in order of responsibility. <br />D. EMERGENCY CONTAINMENT AND CLEANUP PROCEDURES <br />Check <br />the; applicable <br />boxes to indicate your facility's procedures <br />for containing spills and preventing and mitigating releases, fires and/or explosions, <br />Ai. <br />1. <br />MONITOR FOR LEAKS, RUPTURES, PRESSURE BUILD-UP, ETC.; <br />❑ 2. <br />PROVIDE STRUCTURAL PHYSICAL BARRIERS (e.g., Portable spill containment walls, built-in berms); <br />Q 3. <br />PROVIDE ABSORBENT PHYSICAL BARRIERS (e.g., Pads, spill pigs, spill pillows); <br />04. <br />COVER OR BLOCK FLOOR AND/OR STORM DRAINS; <br />❑ 5. <br />LINED TRENCH DRAINS AND/OR SUMPS; <br />[:16, <br />AUTOMATIC FIRE SUPPRESSION SYSTEM; <br />jE[ 7. <br />ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS; <br />Q 8, <br />STOP PROCESSES AND/OR OPERATIONS; <br />❑ 9. <br />AUTOMATIC / ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM; <br />10. <br />SHUT OFF WATER, GAS, ELECTRICAL UTILITIES, <br />0 11, <br />CALL 9-1-1 FOR PUBLIC EMERGENCY RESPONDER ASSISTANCE AND/OR MEDICAL .AID; <br />Fq 12, <br />NOTIFY AND EVACUATE PERSONS IN ALL THREATENED AND/OR IMPACTED AREAS; <br />13. <br />ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTER EVACUATION; <br />❑ 14. <br />PROVIDE PROTECTIVE EQUIPMENT FOR ON-SITE_ EMERGENCY RESPONSE TEAloI; <br />❑ 15. <br />REMOVE CONTAINERS AND/OR ISOLATE AREAS; <br />R 16. <br />HIRE LICENSED HAZARDOUS WASTE CONTRACTOR; <br />Q 17. <br />USE ABSORBENT MATERIAL FOR SPILL CONTAINMENT; <br />❑ 18. <br />VACUUM SUCTION USING APPROPRIATE VACUUM (e.g., Intrinsically safe) FOR SPILL CONTROL AND/OR CLEANUP; <br />❑ 19. <br />DECONTAMINATE PERSONNEL AND EQUIPMENT WITHIN DESIGNATED AREA AND DISPOSE OF WASTEWATER AS HAZARDOUS WASTE, <br />Q' 20. <br />PROVIDE SAFE TEMPORARY STORAGE OF HAZARDOUS WASTE GENERATED DURING EMERGENCY ACTIONS; <br />❑ 21.OTHER <br />(Specify): <br />D <br />E. FACILITY EVACUATION <br />THE FOLLOWING ALARM SIGNALS) WILL BE USED TO BEGIN EVACUATION OF THE FACILITY (Check all that apply): <br />Et. <br />❑ t. <br />BELLS; <br />E2. <br />❑ 2. <br />HORNS/SIRENS; <br />1 . <br />VERBAL (i.e., Shouting); <br />❑ 4. <br />OTHERS = <br />THE FCELOWING LOCATION(S) WILL BE USED FOR AN EMERGENCY ASSEMBLY AREA(S) (e.g., Parking lot, street comer): <br />£3 <br />op <br />Note: <br />The Emergency Coordinator must account for all onsite employees and visitors after evacuation. <br />EVACUATION ROUTE S AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS: <br />E4, <br />❑ 1. <br />WRITTEN PROCEDURES DESCRIBING ROUTES, EXITS, AND ASSEMBLY AREAS; <br />❑ 2. <br />EVACUATION MAP(S) DEPICTING ROUTES, EXITS, AND ASSEMBLY AREAS; <br />❑ 3. <br />OTHER (Specify): Es. <br />Note: <br />Evacuation procedures and/or maps should be posted in visible facility, locations and must be included in the Contingency Plan, <br />F. ARRANGEMENTS FOR EMERGENCY SERVICES <br />ADVANCE ARRANGEMENTS FOR LOCAL EMERGENCY SERVICES (Check one of the following): <br />Ft. <br />❑ I. <br />HAVE BEEN DETERMINED NOT NECESSARY; <br />❑ 2. <br />THE FOLLOWING ARRANGEMENTS HAVE BEEN MADE (Specify): <br />r2' <br />Note: <br />Advance arrangements with local fire and police departments, hospitals, state and local emergency response teams, and/or emergency services <br />contractors should be. made for your facility, if necessary. Large Quantity Generators must describe arrangements in the Contingency Plan. <br />Rev. 03/07/17 Page 2 of 4 <br />