Laserfiche WebLink
2 <br /> <br />6. Rain water accumulated inside of a secondary containment that has mixed with oil <br />may be drained if…. <br />a. It is raining <br />b. There is less than 1000 gallons total <br />c. The drain valve is locked immediately afterward <br />d. The oil is first removed <br /> <br />7. Why is it important to limit the amount of rain water allowed to accumulate inside <br />of secondary containment structures? <br />a. Rain water can short out electrical lines <br />b. Rain water can damage concrete structures <br />c. Rain water can contaminate the oil or fuel in the primary vessel <br />d. Rain water can detract from the capacity of the secondary containment to <br />contain a leak <br /> <br />8. If a secondary containment structure has a drain valve, in what position should it be <br />kept? <br />a. Sealed closed unless draining product or clean rain water <br />b. Open at all times except while draining clean rain water <br />c. Sealed closed unless the primary vessel is being filled <br />d. Open unless the primary vessel is being emptied <br /> <br />9. Why is important to limit the amount of rainwater allowed to accumulate inside a <br />secondary containment structure? <br />a. Rain water can damage concrete structures <br />b. Rain water can short out electrical lines. <br />c. Rain water can contaminate the oil or fuel in the primary container <br />d. Rain water reduce the capacity of the secondary containment to contain an oil <br />leak <br /> <br />10. The “SPCC Coordinator” is also known as the… <br />a. Environmental Manager <br />b. Plant Manager <br />c. Batch Unloader <br />d. Shift Supervisor