My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2026 8:11:59 PM
Creation date
2/24/2025 7:48:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231455
PE
2361 - UST FACILITY
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
Manteca
Zip
95336
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1711 E Yosemite AVE Manteca 95336
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> A separate Monitori g System Certirrcation Form must be prepared for each control panel. <br /> Make of Monitoring System 1, Model of Monitoring System Software Version Installed <br /> Control Panel Control Panel <br /> Veeder-Root TLS-35OR 336.02 <br /> Attach the post-certification reports if the monitoring system is capable of generating <br /> either,•xMonitoring Sy tem Set-up xAlarm History Report Yes No NA, <br /> All monitoring equipment is operational per manufacturer's specifications? x ❑ <br /> Secondary containment systems arefree of damage, debris, or liquid? x ❑ <br /> Are the audible and visual alarms operational? x ❑ <br /> All sensors have been: 1) visually inspected for wiring kinks, breaks andresiduai buildup on x ❑ Cl <br /> floats; and 2) tested for functionality and confirmed operational? <br /> Are all sensors installed to detect a release at the earliest opportunity in the secondary x ❑ ❑ <br /> containment? <br /> The monitoring system set-up was reviewed,and proper settings confirmed? x ❑ Cl <br /> Was the monitoring control panel's backup battery visually inspected, functionally tested, x ❑ ❑ <br /> and confirmed operational? <br /> Does the flow of fuel c,top at the dispenser if a release is detected in the under-dispenser x ❑ <br /> containment? <br /> Does the turbine autornatically shut down if the piping secondary containment monitoring x <br /> system fails to operate or is electrically disconnected? <br /> Does the turbine auto atically shut down if the piping secondary containment monitoring <br /> system detects a rele se?Which sensors initiate positive shut down? (Check all that x Cl ❑ <br /> apply)xSump xUDC <br /> If monitoring system alarms are relayed to a remote monitoring center, is all communication ❑ ❑ x <br /> equipment operational? <br /> Describe all answer marked "No"or"Fail"and proposed remedy in Section 9. <br /> List all monitoring equipment either replaced or repaired in Section 9 <br /> Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.