Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ® Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> Test Equipment Used: Caldwell Sump Tester <br /> Sump/UDC ID 87 Turb. Sump 91 Turb. Sump DSL Turb.Smp <br /> Sump Manufacturer Uknown Uknown Uknown <br /> Sump Depth (inches) 44 inches 44 inches 44 inches <br /> Sump Bottom to Top of 19 inches 19 inches 15 inches <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 1:OOpm 1:45pm 2:30pm <br /> Initial Reading 2nd Ring 2nd Ring 2nd Ring <br /> Test End Time 1:30pm 2:15pm 3:OOpm <br /> Final Reading 2nd Ring 2nd Ring 2nd Ring <br /> Change in Reading 0 Change 0 Change 0 Change <br /> Pass/Fail Criteria 0.05 in .5 h 0.05 in .5 h 0.05 in .5 h <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> Sump/UDC ID Disp. 1-2 Disp. 3-4 Disp. 5-6 Disp. 7-8 <br /> Sump Manufacturer Bravo Bravo Bravo Bravo <br /> Sump Depth (inches) 8 inches 8 inches 8 inches 8 inches <br /> Sump Bottom to Top of 6 inches 6 inches 6 inches 6 inches <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 1:30pm 2:15pm 3:OOpm 3:45pm <br /> Initial Reading 2nd Ring 2nd Ring 2nd Ring 2nd Ring <br /> Test End Time 2:OOpm 2:45pm 3:30pm 4:15pm <br /> Final Reading 2nd Ring 2nd Ring 2nd Ring 2nd Ring <br /> Change in Reading 0 Change 0 Change 0 Change 0 Change <br /> Pass/Fail Criteria 0.05 in .5 hr 0.05 in .5 hr 0.05 in .5 hr 0.05 in .5 hr <br /> Tightness Test Results ® Pass ❑ Fail M Pass ❑ Fail ® Pass ❑ Fail M Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />