My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
18260
>
2800 - Aboveground Petroleum Storage Program
>
PR0544269
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2025 2:41:35 PM
Creation date
2/24/2025 2:37:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0544269
PE
2832 - AST FAC 10 K - </=100 K GAL CUMULATIVE
FACILITY_ID
FA0013586
FACILITY_NAME
Tesla Lathrop
STREET_NUMBER
18260
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
Lathrop
Zip
95330
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
18260 S Harlan RD Lathrop 95330
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Health Department <br />CP22 - AST Non-Qualified Inspection Report <br />Date: <br />October 17, 2024 <br /> Facility Address: <br /> 18260 S Harlan RD, Lathrop <br /> Facility Name: <br /> Tesla Lathrop <br />A partial inspection was conducted and was continued on October 21, 2024. <br />An inspection checklist was provided to the facility operator on the day of inspection. A complete report was <br />finished on October 25, 2024 and replaces the initial checklist. <br />Complete and submit a copy of the Return to Compliance Certification form to the EHD with a statement <br />documenting the corrective actions that have been or will be taken for each violation, and any supporting <br />paperwork, within 30 days of receiving the complete inspection report. <br />The following was observed during this inspection: Diesel generator fuel tank with a 200-gallon capacity of diesel, <br />Diesel generator fuel tank with a 1,250-gallon capacity, 2x 550 gallon diesel fire pump room tanks, and several <br />drums and totes of used and new oil and totes of cutting fluid and cutting waste in the HW/HM storage area. <br />The following was provided during this inspection: Schedule of free CUPA classes , inspection checklist, <br />inspection report, return to compliance certification form <br />Photos were taken by Victoria Oster , Senior Environmental Manager of Tesla . Report emailed to Victoria Oster . <br />Jordan Bottorff, <br />Environmental Contact <br />October 17, 2024 <br />(209) 616-3029Printed Name and Title: <br /> Date: Inspector: <br /> Matthew Won, EHS <br /> Inspector Phone: Received by: <br />AFTER THE COMPLIANCE DATE, EHD WILL BILL FOR ALL TIME AND ACTIVITIES ASSOCIATED WITH BRINGING THIS <br />FACILITY BACK INTO COMPLIANCE. <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />FA0013586 PR0544269 SC001 10/17/2024 <br />EHD Rev. 12/06/2021 CP22 - AST Non-Qualified OIRPage 8 of 8 <br />1868 E. Hazelton Avenue | Stockton, California 95205 | T 209 468-3420 | F 209 464-0138 | www.sjgov.org/EHD
The URL can be used to link to this page
Your browser does not support the video tag.