Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed bV ❑ Manufacturer 0 IndustrV Standard ❑ Professional <br /> Test TVpe ❑ Pressure ❑ Vacuum 0 H drostatic <br /> Test Equipment Used: INCON TS STS <br /> Sump/UDC ID Fill/Piping Fill/Piping Vault <br /> Sump Manufacturer Xerxes Bravo <br /> Sump Depth (inches) 60 32 <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) 28 18 <br /> Test Start Time 15:36 15:36 <br /> Initial Reading 7.0492 3.2069 <br /> Test End Time 15:51 15:51 <br /> Final Reading 7.0501 3.2067 <br /> Change in Reading 0.0009 0.0002 <br /> Pass/Fail Criteria 0.002 1 0.002 <br /> Tightness Test Results 0 Pass ❑ Fail 0 Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 7 <br />