Laserfiche WebLink
No problem with the last minute appointment arranging. We try to keep an inspector on <br />call each day for things that might come up. Aaron has the new documents you've sent <br />over, so he'll take at look at them and amend your approval letter. <br />Thanks for all the updates! <br />Stacy Rivera <br />Lead Sr. Registered Environmental Health Specialist <br />San Joaquin County Environmental Health Department <br />1868 E. Hazelton Ave., Stockton, CA 95205 <br />phone (2o9) 616-3043 <br />faX (209) 468-3433 <br />*Test notifications and test results should be sent to the general UST email: ustsjgov.org* <br />*NOTE* I will be out of office every other Friday. If you are unable to reach me on those days and need to <br />speak to someone immediately, please call (209) 468-3420 or email our UST email address. <br />June 6, 20 1 July 18 1 August 1, 15, 29 1 September 12, 26 <br />EHD will be closed for the holidays on: <br />July 4 1 September 1 1 November 11, 27, 28 1 December 25 <br />From: Ryan Brownlee <Ryan. Brownlee @ablemaintenance.com> <br />Sent: Friday, September 19, 2025 3:18 PM <br />To: Rivera, Stacy [EHD] <srivera@sjgov.org>; Madera, Aaron [EHD] <amadera@sjgov.org>; Christina <br />Tran<christinat@servicestationsystems.com> <br />Cc: Cheryl Curtis <Cheryl.Curtis@ablemaintenance.com>; Tyler Brownlee <br /><Tyler.Brown lee@a blemaintenance.com> <br />Subject: Re: Notification - A Gas -Food Mart - 2115 W Yosemite, CA 95337 - [Disp. 3/4 Repairs] - Job# <br />612354 - SR2500950 <br />Stacy, <br />Okay... First I just want to apologize for the Friday fire drill. <br />I feel like the boy who cried wolf. Asked for a late notice inspection then it doesn't happen. I <br />appreciate the agencies flexibility and going out of your way... <br />@Christina Tran we need to amend this permit application. <br />We have two failures at this site that we assumed from the previous contractor... <br />1. Failing components <br />1. UDC% <br />2. 91 STP <br />The 91 STP was repaired by the previous contractor, we just need to test it with the agency. <br />They made repairs to the two conduit boots inside of the 91 STP. No excavation. <br />UDC % has been repaired by us. We have removed the dispenser. Excavated on the one side. <br />Removed the conduit boots inside and outside and installed Bravo Split retrofit fittings. <br />