Laserfiche WebLink
7.0 Next Scheduled Formal Inspection <br /> Comments <br />Formal Inspection Is Required in (years): <br />The tank is equipped with spill control and/or CRDM (continuous <br />release detection method) and is considered a Category 1 tank per <br />table 5.5 of STI SP001. The next formal inspection would be required <br />in 5 years or as required by the sites SPCC Plan. The inspection <br />schedule is based on the site completing the recommended repairs <br />as noted in the inspection report. If problems are identified during <br />periodic inspections a formal inspection may required soon. The <br />condition of the equipment may change after the issuance of this <br />report. <br />Other Not all readings were above the standard. <br />7