My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
1333
>
2800 - Aboveground Petroleum Storage Program
>
PR0528795
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 2:43:45 PM
Creation date
3/4/2025 4:59:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0528795
PE
2832 - AST FAC 10 K - </=100 K GAL CUMULATIVE
FACILITY_ID
FA0005630
FACILITY_NAME
CENTRAL VALLEY WASTE SERVICES
STREET_NUMBER
1333
Direction
E
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95241
APN
04908045
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1333 E TURNER RD LODI 95241
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hazardous Waste Tank Assessment January 21, 2022 <br />Central Valley Waste Services Project No. 1246 <br />Lodi, CA Page 2 <br /> <br />1” diameter solid welded type “L” copper pipe. The copper pipe runs along the outside of <br />the sheet metal vehicle maintenance facility, then penetrates the wall and connects to <br />portable drain pans filled with used oil. The AST has the following fittings on top, as <br />shown on the design drawing provided in Attachment A: <br />➢ One 4” in primary tank with spillbox for manual filling. <br />➢ One 2” port in primary tank (electrical) <br />➢ One 2” port in primary tank (fill port via 1” copper pipe) <br />➢ Four 2” ports in primary tank (blank). <br />➢ One 2” port in primary tank with 90-degree camlock fitting (tank effluent) <br />➢ Two 6” ports in primary tank (one blank, one vent). <br />➢ One 6” port in secondary containment (emergency vent). <br />➢ One 2” monitoring port in secondary containment. <br />➢ One 2” in secondary containment (electrical for monitoring probe) <br />• Description of any external and internal pumps {22 CCR §66265.192(k)(2)(d)} <br />Graco model Husky 1040 double diaphragm pneumatic pump, design flow 40 gpm. The <br />pump is located inside the maintenance facility. <br />• Sketch or drawing of tank including dimensions {22 CCR §66265.192(k)(2)(e)} <br />See design drawing (Attachment A) and photographs of the tank system (Attachment B) <br />• Documented age of the tank system, if available {22 CCR §66265.192(k)(3)} <br />The tank is approximately 20 years old. <br />• Description and evaluation of any leak detection equipment {22 CCR §66265.192(k)(4) <br />The interstitial space is monitored through a 2” diameter port that accesses the annular <br />space between the primary and secondary tanks. An electronic probe at the bottom of the <br />annular space will detect leakage from the primary tank and send an audible alarm to the <br />Husky 007 tank monitoring system inside the maintenance facility. The audible alarm was <br />tested during the inspection and found to be properly operating. <br />• Description and evaluation of any corrosion protection, equipment, devices, or material <br />{22 CCR §66265.192(k)(5)}: <br />The outside of the AST is in good condition and factory coated with an epoxy coated finish <br />to prevent oxidation. The paint coating is in fair condition with a few minor rust spots in <br />places on the sides of the tank. The tank is in a covered wash bay and is not in direct <br />contact with soil or precipitation. The tank is adequately protected from corrosion. The <br />primary tank and secondary tanks are constructed of 10-gauge mild steel. It is not possible <br />to evaluate corrosion of the primary tank since it is enclosed within the secondary tank, <br />thus no evaluation could be made with respect to corrosion of the primary tank. <br />• Description and evaluation of spill prevention and overfill equipment {22 CCR <br />§66265.192(k)(6)} <br />The Husky 007 level gauge monitors the liquid level within the primary tank such that an <br />audible alarm sounds inside the Maintenance building if the tank exceeds 80% of maximum <br />capacity. The A spill kit is in the maintenance facility. <br />• Description and evaluation of secondary containment for the tank system and ancillary
The URL can be used to link to this page
Your browser does not support the video tag.