Laserfiche WebLink
SANJ U I Environmental Health Department <br /> COUN - <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans &applications as originals will be retained by EHD) <br /> 9. Site map enclosed? YES[] NO[] <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training <br /> certificates for each person installing or testing any component that is repaired or replaced. Ensure a copy of <br /> the"Site Health and Safety Plan" is available on the jobsite as required by Title B. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a <br /> diagram drawn to scale showing location of repairs and/or replacements. If repairing a component, describe <br /> how this will be done. (If adding piping, UDC's, or other UST equipment, or performing tank top upgrade, <br /> use the UST Installation Application pages 4-8 as necessary for a timely plan review): <br /> Replace all product piping using existing ducting. No excavation required. Existing piping in chase pipes. <br /> Install new entry boots in all secondary containment sumps and UDC's. <br /> Remove existing TLS-350 and install Veeder Root TLS-450_ <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> Western Fiberglass CoFlex piping <br /> Icon Split repair Boots <br /> Veeder Root TLS-450 <br /> Veeder Root DPLLD sensor <br /> OPW shear valves <br /> QPW emergency shut off valves <br /> 5. Decontamination Procedures: <br /> a. Will piping be decontaminated prior to removal? YES[] NO[] <br /> b. Identify contractor performing decontamination: <br /> Name Phone (_) <br /> Address City Zip <br /> 3of6 <br />