Laserfiche WebLink
Recommended Practices for the Testing and Verification of Spill,Overfill,Leak detection and Secondary Containment Equipment at UST Facilities <br /> wary containment of secondarily contained spill <br /> buckets. WARNING- Use only an air operated vacu <br /> um source or a vacuum pump powered by <br /> 6.3.2 Description of Test. Using a specially an explosion-proof motor. Vacuum pumps <br /> equipped test cover, a partial vacuum is applied to with electric motors that are not explo- <br /> the spill bucket.The vacuum level is monitored for sion-proof may ignite flammable vapors. <br /> a 1-minute period. If a portable air compressor is used, it <br /> should be located at least 20 feet away <br /> 6.3.3 Test Equipment. Test equipment shall from the venturi-eductor or outside any <br /> include: Class I, Division 1 area. <br /> • Vacuum test apparatus (The test apparatus may --... <br /> be available from the spill bucket manufacturer. 6.3.4 Preparation. <br /> It includes an air pressure regulator, a vacuum <br /> source, a vacuum gauge with a minimum 0-50 1.Remove and properly dispose of any liquid and <br /> inch water column range and a control valve.The debris (leaves, sediment and trash) in the spill <br /> control valve is used to adjust the vacuum level.); bucket.Clean the spill bucket and examine it for <br /> ■ Test cover (The cover is equipped with a test damage, defects or improperly installed compo- <br /> fitting.); nenls.If there are loose components (e.g.,loose <br /> hand clamps or bolls),tighten these items before <br /> • Plumber's plug(appropriate size,if used); performing the integrity test. If there are items <br /> • Stopwatch or other time-measurement device that must be repaired or replaced (e.g., deteria- <br /> capable of measuring a 1-second increment; bated gasketslseals or drain valves), notify the <br /> owner/operator to obtain approval before pro- <br /> • Gasketing material (The purpose of the gas- ceeding with the needed repairs. <br /> keting material is to provide an air-tight seal <br /> 2 <br /> between the test cover and the spill bucket.]. •Examine the fill cap and adapter fitting for <br /> loose,missing or damaged parts and make nec- <br /> essary repairs.Make sure that the seal on the fill <br /> o-so"Water Column cap is present and in good condition. Tire cap <br /> varuufn vacuum Gauge must fit securely and be leak-tight on the riser, <br /> Source p A leaking cap will result in a failed test. As an <br /> alternative to a tight till cap, use a plumber's <br /> plug in the fill riser. <br /> Convoi 3,The spill bucket drain valve,if resent,must be <br /> Valve p p <br /> leak-tight to pass the test. If the drain valve is <br /> not leak-tight, it may he removed and perma- <br /> nently plugged. <br /> NOTE: Before permanently plugging, ensure <br /> that local regulations allow the drain valve to <br /> Plumber's Plug in <br /> Tank Riser Pike be permanently plugged. <br /> 4.Clean any contamination firm the tap surface <br /> of the spill bucket where the cover makes a seal <br /> and line it with gaskcting material. <br /> 5.Place the test cover on the spill bucket,con- <br /> finning that it makes a tight seal with the gas- <br /> keLWg material. <br /> FIGURE 6-2. The cover must mace a tight seat with the 6.Connect the line from the vacuum source to the <br /> spill bucket to prevent leakage when the vacuum is adapter on the cover. <br /> pulled during the test. <br /> T.If the spill bucket is found to have cracks,loose <br /> parts or separation of the bucket from the fill <br /> pei.org <br /> I <br />