My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15237
>
2300 - Underground Storage Tank Program
>
PR0517272
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2026 8:09:31 PM
Creation date
3/10/2025 11:17:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0517272
PE
2361 - UST FACILITY
FACILITY_ID
FA0012979
FACILITY_NAME
FLYING J TRAVEL PLAZA #617
STREET_NUMBER
15237
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
Lodi
Zip
95242
APN
02519014
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
15237 N Thornton RD Lodi 95242
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PEIIRP1200-12 <br /> 6.2.1 Purpose. This method is used to test the 6.If the spill bucket is found to have cracks,loose <br /> integrity of single-walled spill buckets or the pri- parts or separation of the bucket from the fill <br /> wary containment of secondarily contained spill pipe, it is not considered to he liquid-tight.This <br /> buckets. visually indicates a test failure. <br /> 6.2.2 Description of Test. The spill bucket is NOTE: If the fill cap is not included in the <br /> filled with water.The water level is measured at the spill bucket test and/or the cap is not tight,it <br /> beginning and end of the test. could be the source of potential fuel contami- <br /> 6.2.3 Test Equipment. 'lost equipment shall nation from water intrusion. <br /> include: <br /> NOTE: Before permanently plugging, ensure <br /> ■ water' that local regulations allow the drain valve to <br /> • measuring stick that is accurate to within 1116 be permanently plugged. <br /> (0.063)inch and of sufficient length; <br /> ■ plumber's plug(appropriate size, if used); 6.2.5 Test Pracedure. <br /> stopwatch or other time-measurement device 1.Add water to the spill bucket to a level within <br /> capable of measuring a 1-second increment. 1.5 inches of the top of the spill bucket.Allow <br /> the water to settle for 5 minutes before the initial <br /> 6.2.4 Preparation_ water level measurement is taken. <br /> 1.Care should be taken when conducting the test 2.Place the measuring stick vertically at the lowest <br /> in the rain or during freezing weather condi- point in the spill bucket and extending above the <br /> Lions. water level to allow for an accurate measure- <br /> 2.Remove and properly dispose of any liquid and meat to be taken.The location of the measuring <br /> debris (leaves, sediment and trash) in the spill stick must remain the same for each water level <br /> bucket.Clean the spill bucket and examine it for measurement. Document the initial water level <br /> damage,defects or improperly installed compo- measurement as measured from the bottom of <br /> nents. If there are loose components (e.g,, loose the spill bucket.Alternative measurement meth- <br /> band clamps or bolts),tighten these items before ods may he used provided that measurement to <br /> conducting the integrity test. If there are items 1/16(0.063) inch can be made. <br /> that must be repaired or replaced (e.g., deterio- 3.Take all precautions to prevent the water level I <br /> rated gaskets/seals or drain valves), notify the from being disturbed during the duration of the f <br /> owner/operator. test. <br /> S.Examine the fill cap and adapter fitting for 4.After 1 hour, document the ending water level <br /> loose, missing or damaged parts, and make measurement, <br /> necessary repairs. Complete any repairs before S.Upon completion of the test, remove and dis- <br /> putting water in the spill bucket.Make sure that <br /> the seal on the fill cap is present and in good pose of the water according to Section 6.7, and <br /> dry the inside of the spill bucket before returning <br /> condition.The cap must fit securely and be leak- <br /> it to service. <br /> tight on the riser.The water level during the test <br /> typically will be above the cap,so a leaking cap 6.2.6 Pass/Fall Criteria. If the water level has <br /> will result in a failed test.As an alternative to a dropped less than 118 (0,125)inch,the spill bucket <br /> tight Mill cap,use a plumber's plug in the-fill riser passes the integrity test. <br /> if approved by the authority having jurisdiction <br /> (AM and tank owner. If the water level has dropped 1/8 (0.125) inch or <br /> 4.The spill-bucket drain valve, if present, must greater,the spill bucket fails the integrity test. <br /> be leak-tight to pass the test. If it is not leak- 6.3 Spill Bucket Integrity Testing - Vacuum Test <br /> tight, it may be possible to simply remove and Method. <br /> permanently plug the drain valve, However, if <br /> you choose to permanently plug,ensure that the 6.3.2 Purpose. This method is used to test the <br /> local regulations allow this modification. integrity of single-walled spill buckets or the pri- <br /> pei,org <br />
The URL can be used to link to this page
Your browser does not support the video tag.