various subcontractors to perform the work appropriate weather conditions and no delays due to
<br /> COVID-19 related work restrictions/permitting.
<br /> Third Quarter 2023 RWQCB approves interim remedial actions
<br /> Fourth Quarter 2023 Well MW-11 installation and development is completed
<br /> Third Quarter 2025 Submission of monitoring report following the third sampling
<br /> event of well MW-11, which will include the revised injection well
<br /> locations
<br /> Fourth Quarter 2025 RWQCB approves revised injection well locations
<br /> First Quarter 2026 Injection well field work completed
<br /> 8 References
<br /> • AMEC Geomatrix, Inc., 2010, Groundwater Corrective Action Plan, UniFirst Facility, Stockton,
<br /> California, April 19 (AMEC Geomatrix, 2010a).
<br /> • AMEC Geomatrix, Inc., 2010, Groundwater Interim Remedial Action Plan, UniFirst Facility,
<br /> Stockton, California, October 29 (AMEC Geomatrix, 2010b).
<br /> • AMEC Geomatrix, Inc., 2011, Groundwater Interim Remedial Action Plan Addendum, UniFirst
<br /> Facility, Stockton, California, February 21 (AMEC Geomatrix, 2011 a).
<br /> • AMEC Geomatrix, Inc., 2011, Groundwater Remediation Pilot Test Installation Report, UniFirst
<br /> Facility, Stockton, California, October 31 (AMEC Geomatrix, 2011 b).
<br /> • Central Valley Regional Water Quality Control Board, 2021, Review of Soil Vapor Sampling
<br /> Results Report, UniFirst, 819 Hunter Street, Stockton, San Joaquin County, March 4 (RWQCB,
<br /> 2021).
<br /> • Geomatrix Consultants, Inc., 2007, Additional Groundwater Investigation Work Plan, UniFirst
<br /> Facility, 819 North Hunter Street, Stockton, California, April (Geomatrix, 2007a).
<br /> • Geomatrix Consultants, Inc., 2007, Additional Groundwater Investigation Results, UniFirst Facility,
<br /> Stockton, California, December 28 (Geomatrix, 2007b).
<br /> • Geomatrix Consultants, Inc. 2008, Monitoring Well Installation and First Quarter 2008
<br /> Groundwater Monitoring Results, UniFirst Facility, Stockton, California, April (Geomatrix, 2008).
<br /> • Camp, Dresser and McKee, 2001, Water Management Plan, San Joaquin County Flood Control
<br /> and Water Conservation District(CDM, 2001).
<br /> • Environmental Engineering & Contracting, Inc., 2001, Phase I Environmental Site Assessment at
<br /> Parisian Industrial Service Facility and Adjacent Properties, February (EECI, 2001).
<br /> • Environmental Engineering & Contracting, Inc., 2004, Final Report—Site Assessment UST
<br /> Removal and Remediation, Unifirst Laundry Facility, 125 East Flora Street, Stockton, California,
<br /> September(EECI, 2004).
<br /> • U.S. Geological Survey, 2006, Sources of High-Chloride Water to Wells, Eastern San Joaquin
<br /> Ground-Water Subbasin, California, Open File Report 2006-1309, November(USGS, 2006).
<br /> • Wood Environment& Infrastructure Solutions, Inc., 2019, First Semiannual 2019 Groundwater
<br /> Monitoring Report, UniFirst Facility, Stockton, California, June 5 (Wood, 2019).
<br /> • Wood Environment& Infrastructure Solutions, Inc., 2021, Soil Vapor Sampling Results, UniFirst
<br /> Facility, Stockton, California, January 5 (Wood, 2021 a).
<br /> • Wood Environment& Infrastructure Solutions, Inc., 2021, Second Semiannual and Annual 2021
<br /> Groundwater Monitoring Report and Well Cluster MW-10 Installation Report, UniFirst Facility,
<br /> Stockton, California, November 29 (Wood, 2021 b).
<br /> 2019 Groundwater Interim Remedial Action Work Plan—Revision 3 Page 9
<br /> UniFirst Facility,Stockton,California
<br /> Project No.0132902023
<br /> I:\13000s\13290\Arch ive\13290-177.docx
<br />
|