Laserfiche WebLink
various subcontractors to perform the work appropriate weather conditions and no delays due to <br /> COVID-19 related work restrictions/permitting. <br /> Third Quarter 2023 RWQCB approves interim remedial actions <br /> Fourth Quarter 2023 Well MW-11 installation and development is completed <br /> Third Quarter 2025 Submission of monitoring report following the third sampling <br /> event of well MW-11, which will include the revised injection well <br /> locations <br /> Fourth Quarter 2025 RWQCB approves revised injection well locations <br /> First Quarter 2026 Injection well field work completed <br /> 8 References <br /> • AMEC Geomatrix, Inc., 2010, Groundwater Corrective Action Plan, UniFirst Facility, Stockton, <br /> California, April 19 (AMEC Geomatrix, 2010a). <br /> • AMEC Geomatrix, Inc., 2010, Groundwater Interim Remedial Action Plan, UniFirst Facility, <br /> Stockton, California, October 29 (AMEC Geomatrix, 2010b). <br /> • AMEC Geomatrix, Inc., 2011, Groundwater Interim Remedial Action Plan Addendum, UniFirst <br /> Facility, Stockton, California, February 21 (AMEC Geomatrix, 2011 a). <br /> • AMEC Geomatrix, Inc., 2011, Groundwater Remediation Pilot Test Installation Report, UniFirst <br /> Facility, Stockton, California, October 31 (AMEC Geomatrix, 2011 b). <br /> • Central Valley Regional Water Quality Control Board, 2021, Review of Soil Vapor Sampling <br /> Results Report, UniFirst, 819 Hunter Street, Stockton, San Joaquin County, March 4 (RWQCB, <br /> 2021). <br /> • Geomatrix Consultants, Inc., 2007, Additional Groundwater Investigation Work Plan, UniFirst <br /> Facility, 819 North Hunter Street, Stockton, California, April (Geomatrix, 2007a). <br /> • Geomatrix Consultants, Inc., 2007, Additional Groundwater Investigation Results, UniFirst Facility, <br /> Stockton, California, December 28 (Geomatrix, 2007b). <br /> • Geomatrix Consultants, Inc. 2008, Monitoring Well Installation and First Quarter 2008 <br /> Groundwater Monitoring Results, UniFirst Facility, Stockton, California, April (Geomatrix, 2008). <br /> • Camp, Dresser and McKee, 2001, Water Management Plan, San Joaquin County Flood Control <br /> and Water Conservation District(CDM, 2001). <br /> • Environmental Engineering & Contracting, Inc., 2001, Phase I Environmental Site Assessment at <br /> Parisian Industrial Service Facility and Adjacent Properties, February (EECI, 2001). <br /> • Environmental Engineering & Contracting, Inc., 2004, Final Report—Site Assessment UST <br /> Removal and Remediation, Unifirst Laundry Facility, 125 East Flora Street, Stockton, California, <br /> September(EECI, 2004). <br /> • U.S. Geological Survey, 2006, Sources of High-Chloride Water to Wells, Eastern San Joaquin <br /> Ground-Water Subbasin, California, Open File Report 2006-1309, November(USGS, 2006). <br /> • Wood Environment& Infrastructure Solutions, Inc., 2019, First Semiannual 2019 Groundwater <br /> Monitoring Report, UniFirst Facility, Stockton, California, June 5 (Wood, 2019). <br /> • Wood Environment& Infrastructure Solutions, Inc., 2021, Soil Vapor Sampling Results, UniFirst <br /> Facility, Stockton, California, January 5 (Wood, 2021 a). <br /> • Wood Environment& Infrastructure Solutions, Inc., 2021, Second Semiannual and Annual 2021 <br /> Groundwater Monitoring Report and Well Cluster MW-10 Installation Report, UniFirst Facility, <br /> Stockton, California, November 29 (Wood, 2021 b). <br /> 2019 Groundwater Interim Remedial Action Work Plan—Revision 3 Page 9 <br /> UniFirst Facility,Stockton,California <br /> Project No.0132902023 <br /> I:\13000s\13290\Arch ive\13290-177.docx <br />