Laserfiche WebLink
Well cap <br /> Ir11 <br /> GR0wO —III III Elevation Elevation' <br /> round to of Diameter <br /> (g (top Depth Below Ground Surface(feet) <br /> A(ground surface) cF - Well surface) casing) (inches) <br /> Number A B C D E F G H I J <br /> IW-5A TBD TBD 0 20 21.5 25 45 46.5 10 2 <br /> B (top of casing) <br /> I- IW-5B TBD TBD 0 56.5 61 65 74.5 75 10 2 <br /> — IW-5C TBD TBD 1 0 87 1 90 95.5 104.5 106.5 10 2 <br /> C (top of grout) MW-11 TBD TBD 1 0 87 1 90 1 95.5 104.51106.51 10 1 2 <br /> Grout seal <br /> J (outside diameter of casing) <br /> Well Construction <br /> D (top of transition seal) <br /> Casing 2-inch Schedule 40 PVC <br /> 3 Screen 2-inch Schedule 40 PVC, 0.01-inch factory slotted screen <br /> E Filter Material No. 2/12 sand <br /> Transition seal Transition Seal 1/4-inch bentonite pellets <br /> Grout Seal Neat cement grout <br /> Surface Finish Locking monument at grade <br /> E (top of filter) <br /> Note: <br /> F (top of screen) <br /> 1. Elevation in feet above NAVD88. TBD =to be determined. <br /> e <br /> m <br /> z <br /> Filter <br /> � 3 <br /> m m <br /> o; Screen <br /> '^M <br /> N <br /> �O <br /> G (base of screen) Injection Well and Monitoring Well <br /> a H (bottom of hole) Screw cap Construction Diagram <br /> o UniFirst Facility <br /> m o Stockton, California <br /> z I By:JBS Date:03/13/23 Project No.013290 <br /> M L <br /> _ (boring diameter) <br /> Ya <br /> 0 3 Figure 6 <br /> o m <br /> ao <br />