Laserfiche WebLink
X% % J ) <br /> TABLES <br /> Table 1 Groundwater Elevations <br /> Table 2 Monitoring Well Groundwater Sample Results— <br /> Chlorinated Volatile Organic Compounds <br /> FIGURES <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan <br /> Figure 3 Potentiometric Surface Map, October 2022 <br /> Figure 4 Volatile Organic Compounds in Groundwater Samples, <br /> October 2022 <br /> Figure 5 Injection Well, Monitoring Well, and Vapor Boring Locations <br /> Figure 6 Injection Well and Monitoring Well Construction Diagram <br /> APPENDICES <br /> Appendix A Time Concentration Charts— MW-5 Well Cluster <br /> Appendix B WSP Well Drilling and Installation Field Protocols <br /> Appendix C Sample Laboratory Report and Product Information <br /> Appendix D Biological Sampling Procedures <br /> 2019 Groundwater Interim Remedial Action Work Plan—Revision 3 Page ii <br /> UniFirst Facility,Stockton,California <br /> Project No.0132902023 <br /> I:\13000s\13290\Arch ive\13290-177.docx <br />