My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2016-2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOVELACE
>
2323
>
4400 - Solid Waste Program
>
PR0440013
>
CORRESPONDENCE_2016-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2025 9:52:58 AM
Creation date
3/25/2025 2:11:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2016-2024
RECORD_ID
PR0440013
PE
4445 - TRANSFER STATION - MONTHLY INSPECTION
FACILITY_ID
FA0001434
FACILITY_NAME
LOVELACE TRANSFER STATION
STREET_NUMBER
2323
STREET_NAME
LOVELACE
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20406020
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Lookup Error
ERROR [38000] ERROR: Invalid customid as arg 3! at line 18.; Error while executing the query
Site Address
2323 LOVELACE RD MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table of Contents <br /> TurboSeparator...........................................................................................................1 <br /> Models T20, T30, T42, THOR, & Mega THOR...............................................................1 <br /> SERVICEand PARTS.............................................................................................................6 <br /> Safety...................................................................................................................................8 <br /> Purpose of System and Definition of SSO............................................................................8 <br /> Expected Separation Quality and Throughput....................................................................9 <br /> System Overview Prior To Startup....................................................................................10 <br /> Infeed Conveyor and Infeed Hopper.............................................................................10 <br /> Outfeed Conveyors-Waste Packaging&Organics.........................................................10 <br /> Turbo Separator(Main Chamber).................................................................................10 <br /> ControlPanel-Electrical.................................................................................................10 <br /> Pre-start Checklist............................................................................................................. 11 <br /> OperationSteps.................................................................................................................12 <br /> Maintenance .....................................................................................................................14 <br /> InitialBreak-In Period....................................................................................................14 <br /> Bearings.........................................................................................................................14 <br /> GearReducer.................................................................................................................14 <br /> ShaftSeals.....................................................................................................................14 <br /> DoubleStuffing Box Seals..........................................................................................14 <br /> PeriodicMaintenance........................................................................................................15 <br /> MaintenanceTable........................................................................................................16 <br /> Troubleshooting................................................................................................................18 <br /> General Troubleshooting and Problem Solving.................................................................18 <br /> FeederOperation..........................................................................................................19 <br /> Troubleshootingfor Feeder...........................................................................................20 <br /> Suggested Settings For Various Materials.........................................................................20 <br /> RequiredTools&Supplies:................................................................................................20 <br /> T20&T30-Removing and Replacing Screens...................................................................22 <br /> 41 Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.