Laserfiche WebLink
OMTE <br />CLD SERIES USERS GUIDE <br />W%rancedTank Monitorfag$Loak[Mmton PORTABLE CONTAINMENT SUMP TESTER <br />111. PREPARING A SITE FOR CLD TESTING (see figures 2.0 and 3.0 for all appropriate, illustrated references) <br />a. Place the OEL8000111-CLD case a minimum of 20 feet away from the dispenser sumps as per NFPA 30A. For <br />tank sump testing, the minimum is 10 feet. <br />b. Section off the work area with safety cones. It is recommended to test in groups allowing the site to remain <br />operational. <br />C. Visually inspect the sump areas and boots for cracks, damage, and interior containment integrity. Properly <br />remove any debris, liquid, and clean the interior. <br />IMPORTANT (this applies to all testing methods): <br />• Consult local codes/rules on the test requirements. <br />• Consult local codes/rules on how to properly dispose of the test liquid. <br />• Make sure the water temperature in the sump is stable before conducting the test. <br />• Avoid any water disturbance during the test. <br />IV. PROCEDURE (consult local codes/rules on the test requirements) <br />1. Fill sumps with water. Test for leak sensor functionality. Your leak sensor, already deployed at the lowest <br />point of the containment sump, should be properly wired to and tested on the site's ATG controller. <br />2. Liquid levels should be above all sump penetrations prior to performing a CLD test. For an optional low <br />sump test, your liquid levels should be 4 inches or more above your leak sensor. <br />3. Extend an angle iron over the sump. Confirm the angle iron is level and secure. <br />4. Suspend probe from the angle iron using the attached chain (refer to Figure 2.0 or 3.0). The probe should <br />not contact the bottom of the sump. It must be free to hang vertically. <br />5. The float must be free to move along the probe with the test liquid (water) in the sump. <br />6. Attach the probe cable from the head of the probe to the probe connector box within the kit. Probe heads <br />are numerically labeled and must coincide with their appropriate probe connector box input. Using tape or <br />weights, stabilize the probe cable so that the probe does not move during testing. <br />7. Plug the grounded three -prong power cord to a grounded electrical receptacle. Power up the system. <br />8. Program the CLD Tester (follow programming instructions) <br />If required for compliance testing, listed are specific agencies and titles of the guidelines. Please refer to their <br />respective documentation: <br />PEI/RP1200-17: Recommended Practices Please refer for the Testing and Verification of Spill, Overfill, <br />Leak Detection and Secondary Containment Equipment at UST Facilities <br />o Section 6.5: Containment Sump Integrity Testing. <br />EPA: EPA Low Liquid Level UST Containment Sump Testing Procedures. <br />OMNTEC Mfg., Inc., 2420 Pond Road, Ronkonkoma, NV 11779 <br />Phone (631) 981-2001 Fax (631) 981-2007 www.OMNTEC.com <br />File Name: 500165 rev2118.docx Page 4 of 8 Rev Date: 3-11-2021 <br />