Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> UST Monitoring Site Plan - - � <br /> Site Address. 6131 PACIFIC AVENUE STOCKTON CA <br /> t <br /> { <br /> i <br /> j <br /> �..y <br /> X7 <br /> . . . . . . . . . . . . . 0 91 T <br /> . . . . . . . . . . . . . . O L - <br /> O <br /> . . . . . . . . . . . . DIE O <br /> KEY . . . . . . . . . <br /> A=ANNULAR Sensor - - <br /> F=FILLS - Lt . . . . . . <br /> V=VAPOR <br /> P=PROBE . . . . . . . . . . . . . . . . . . . . . . . x <br /> L=Turbine/Leak Detector . . . . . . . . . . . - . . . . . . . . . . - <br /> X—SU IP SENSOR . . . . . . . . - - . . . - - - xPIPING'. <br /> B=Brine Sensor - . . . . . . . . . . . . . . . . . . . . . . . . - - Drawing of piping <br /> S=Smart Sensor <br /> C=Floats&Chains cps - exit of sump and <br /> UDC's.No <br /> E=E Stop underground <br /> PACIFIC AVENUE: <br /> drawing is <br /> accurate,we <br /> 4nr items undergronru/that are not Wsihle io the cerfirvmg technician are a cannot speculate <br /> ptoksaional opinumi only and an,vuleh Jhr ir(1 irmfional purpreKs. I)rauvng blue prints. <br /> mN to.Kale <br /> Date map was drawn:8111/21 <br /> Instructions <br /> If you already have a diagram that shows all required information.you may include it.rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors:and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br /> Page 6 of 6 <br />