Laserfiche WebLink
Appendix C - LandGEM - Forward_2033 2043 (Part 2)12/29/2022 <br />Results (Continued) <br />(Mg/year)(m 3 /year)(av ft^3/min) (Mg/year)(m 3 /year)(av ft^3/min) <br />2134 5.513E+03 4.414E+06 2.966E+02 1.472E+03 2.207E+06 1.483E+02 <br />2135 5.403E+03 4.327E+06 2.907E+02 1.443E+03 2.163E+06 1.454E+02 <br />2136 5.296E+03 4.241E+06 2.850E+02 1.415E+03 2.121E+06 1.425E+02 <br />2137 5.192E+03 4.157E+06 2.793E+02 1.387E+03 2.079E+06 1.397E+02 <br />2138 5.089E+03 4.075E+06 2.738E+02 1.359E+03 2.037E+06 1.369E+02 <br />2139 4.988E+03 3.994E+06 2.684E+02 1.332E+03 1.997E+06 1.342E+02 <br />2140 4.889E+03 3.915E+06 2.631E+02 1.306E+03 1.958E+06 1.315E+02 <br />2141 4.792E+03 3.838E+06 2.578E+02 1.280E+03 1.919E+06 1.289E+02 <br />2142 4.697E+03 3.762E+06 2.527E+02 1.255E+03 1.881E+06 1.264E+02 <br />2143 4.604E+03 3.687E+06 2.477E+02 1.230E+03 1.844E+06 1.239E+02 <br />2144 4.513E+03 3.614E+06 2.428E+02 1.206E+03 1.807E+06 1.214E+02 <br />2145 4.424E+03 3.542E+06 2.380E+02 1.182E+03 1.771E+06 1.190E+02 <br />2146 4.336E+03 3.472E+06 2.333E+02 1.158E+03 1.736E+06 1.167E+02 <br />2147 4.250E+03 3.404E+06 2.287E+02 1.135E+03 1.702E+06 1.143E+02 <br />2148 4.166E+03 3.336E+06 2.242E+02 1.113E+03 1.668E+06 1.121E+02 <br />2149 4.084E+03 3.270E+06 2.197E+02 1.091E+03 1.635E+06 1.099E+02 <br />2150 4.003E+03 3.205E+06 2.154E+02 1.069E+03 1.603E+06 1.077E+02 <br />2151 3.924E+03 3.142E+06 2.111E+02 1.048E+03 1.571E+06 1.056E+02 <br />2152 3.846E+03 3.080E+06 2.069E+02 1.027E+03 1.540E+06 1.035E+02 <br />2153 3.770E+03 3.019E+06 2.028E+02 1.007E+03 1.509E+06 1.014E+02 <br />2154 3.695E+03 2.959E+06 1.988E+02 9.870E+02 1.479E+06 9.940E+01 <br />2155 3.622E+03 2.900E+06 1.949E+02 9.675E+02 1.450E+06 9.744E+01 <br />2156 3.550E+03 2.843E+06 1.910E+02 9.483E+02 1.421E+06 9.551E+01 <br />2157 3.480E+03 2.787E+06 1.872E+02 9.295E+02 1.393E+06 9.362E+01 <br />2158 3.411E+03 2.731E+06 1.835E+02 9.111E+02 1.366E+06 9.176E+01 <br />2159 3.344E+03 2.677E+06 1.799E+02 8.931E+02 1.339E+06 8.995E+01 <br />2160 3.277E+03 2.624E+06 1.763E+02 8.754E+02 1.312E+06 8.816E+01 <br />2161 3.212E+03 2.572E+06 1.728E+02 8.581E+02 1.286E+06 8.642E+01 <br />2162 3.149E+03 2.521E+06 1.694E+02 8.411E+02 1.261E+06 8.471E+01 <br />2163 3.086E+03 2.471E+06 1.661E+02 8.244E+02 1.236E+06 8.303E+01 <br />2164 3.025E+03 2.423E+06 1.628E+02 8.081E+02 1.211E+06 8.139E+01 <br />2165 2.965E+03 2.375E+06 1.595E+02 7.921E+02 1.187E+06 7.977E+01 <br />2166 2.907E+03 2.328E+06 1.564E+02 7.764E+02 1.164E+06 7.819E+01 <br />2167 2.849E+03 2.281E+06 1.533E+02 7.610E+02 1.141E+06 7.665E+01 <br />2168 2.793E+03 2.236E+06 1.503E+02 7.460E+02 1.118E+06 7.513E+01 <br />2169 2.737E+03 2.192E+06 1.473E+02 7.312E+02 1.096E+06 7.364E+01 <br />2170 2.683E+03 2.149E+06 1.444E+02 7.167E+02 1.074E+06 7.218E+01 <br />2171 2.630E+03 2.106E+06 1.415E+02 7.025E+02 1.053E+06 7.075E+01 <br />2172 2.578E+03 2.064E+06 1.387E+02 6.886E+02 1.032E+06 6.935E+01 <br />2173 2.527E+03 2.023E+06 1.360E+02 6.750E+02 1.012E+06 6.798E+01 <br />Year Total landfill gas Methane <br />REPORT - 9