Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN-PAGE I (One form per facility) <br /> TYPE OF ACTION ❑ 1.NEW PLAN 2.CHANGE OF INFORMATION R(A. <br /> I. FACILITY INFORMATION <br /> FAC=Y ID# (Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY g� ) R02, <br /> BUSINESS SITE ADDRESS f� rrC A !, ka- <br /> f`� xo3. C1TY <br /> 1 II. SPELL CONTROL ANDt CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> ➢ Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardous. Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed container.Waste material shall be disposed <br /> appropriately. <br /> ➢ Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity,has been in contact with any <br /> hazardous material.If the water is contaminated,it will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds <br /> that it is non-hazardous. N the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick floating petroleum layer may not necessarily display <br /> rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> ➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material,other than the product/waste stared in the primary containment system,is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE:Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ONSITE,BUT AVAILABLE FOR USE IF NEEDED: (Coro lete only if licable) <br /> EQUIPMENT LOCATION AVAILABILITY <br /> s xlo. qwl) R2o. Rao. <br /> �l pia r <br /> o {: - x11. ter �s R21. <br /> r -tfw{ �� <br /> , _` P R31. <br /> lam/J_ R12. I/1�J R32. <br /> ill Yi1/i R13. R23. <br /> R33. <br /> R14. R24. <br /> R34. <br /> R15. R25. R35. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSONS)ISIARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME t �� R40. TITTLE, R50. <br /> r �� <br /> NAME R41. TIME <br /> NAME R42. TITLE R52 <br /> + NAME R43. TITLE R53. <br /> V. MONITORING INDICATORS <br /> 1�1 NtiM NG INDICATES A POSSIBLE UN,A-Ff10RIZED RELEASE,STEPS RIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> ,�j Additional system testing or data collection /Inspection by qualified persons ecalibration of equipment <br /> Other. <br /> R60. <br /> UST Response Plan(1=10)-1st <br />