Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ® Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Vacuum Gauge <br /> Tank ID 87-1 Annular 87-2 Annular 91 Annular <br /> Tank Manufacturer Unknown Unknown Unknown <br /> Tank Capacity 12000 Gal 12000 Gal 12000n Gal <br /> Test Start Time 10:55 AM 10:45 AM 10:35 AM <br /> Initial Reading -7 HG -7 HG -7 HG <br /> Test End Time 11:55 AM 11:45 AM 11:35 AM <br /> Final Reading -7 HG -7 HG -7 HG <br /> Change in Reading 0 HG 0 HG 0 HG <br /> Pass/Fail Criteria 0 HG 0 HG 0 HG <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Pressure Gauge <br /> Pipe Run ID 87-1 Product 87-2 Product 91 Product <br /> Pipe Manufacturer AO Smith AO Smith AO Smith <br /> Test Start Time 10:25 AM 10:28 AM 10:40 AM <br /> Initial Reading 5 PSI 5 PSI 5 PSI <br /> Test End Time 11:25 AM 11:28 AM 11:40 AM <br /> Final Reading 5 PSI 5 PSI 5 PSI <br /> Change in Reading 0 PSI 0 PSI 0 PSI <br /> Pass/Fail Criteria 0 PSI 0 PSI 0 PSI <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> Pipe Run ID 87-1 Vent 87-2 Vent 91 Vent Vapor Return <br /> Pipe Manufacturer AO Smith AO Smith AO Smith AO Smith <br /> Test Start Time 10:42 AM 10:45 AM 10:48 AM 10:30 AM <br /> Initial Reading 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test End Time 11:42 AM 11:45 AM 11:48 AM 11:30 AM <br /> Final Reading 5 PSI 5 PSI 5 PSI 5 PSI <br /> Change in Reading 0 PSI 0 PSI 0 PSI 0 PSI <br /> Pass/Fail Criteria 0 PSI 0 PSI 0 PSI 0 PSI <br /> Tightness Test Results ® Pass ❑ Fail M Pass ❑ Fail M Pass ❑ Fail ® Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />