My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
15
>
2300 - Underground Storage Tank Program
>
PR0231404
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2026 11:57:22 AM
Creation date
4/11/2025 3:12:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231404
PE
2361 - UST FACILITY
FACILITY_ID
FA0002915
FACILITY_NAME
Tracy Market Inc
STREET_NUMBER
15
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21435004
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
15 E GRANT LINE RD TRACY 95376
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ® Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Vacuum Gauge <br /> Tank ID 87-1 Annular 87-2 Annular 91 Annular <br /> Tank Manufacturer Unknown Unknown Unknown <br /> Tank Capacity 12000 Gal 12000 Gal 12000n Gal <br /> Test Start Time 10:55 AM 10:45 AM 10:35 AM <br /> Initial Reading -7 HG -7 HG -7 HG <br /> Test End Time 11:55 AM 11:45 AM 11:35 AM <br /> Final Reading -7 HG -7 HG -7 HG <br /> Change in Reading 0 HG 0 HG 0 HG <br /> Pass/Fail Criteria 0 HG 0 HG 0 HG <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Pressure Gauge <br /> Pipe Run ID 87-1 Product 87-2 Product 91 Product <br /> Pipe Manufacturer AO Smith AO Smith AO Smith <br /> Test Start Time 10:25 AM 10:28 AM 10:40 AM <br /> Initial Reading 5 PSI 5 PSI 5 PSI <br /> Test End Time 11:25 AM 11:28 AM 11:40 AM <br /> Final Reading 5 PSI 5 PSI 5 PSI <br /> Change in Reading 0 PSI 0 PSI 0 PSI <br /> Pass/Fail Criteria 0 PSI 0 PSI 0 PSI <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> Pipe Run ID 87-1 Vent 87-2 Vent 91 Vent Vapor Return <br /> Pipe Manufacturer AO Smith AO Smith AO Smith AO Smith <br /> Test Start Time 10:42 AM 10:45 AM 10:48 AM 10:30 AM <br /> Initial Reading 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test End Time 11:42 AM 11:45 AM 11:48 AM 11:30 AM <br /> Final Reading 5 PSI 5 PSI 5 PSI 5 PSI <br /> Change in Reading 0 PSI 0 PSI 0 PSI 0 PSI <br /> Pass/Fail Criteria 0 PSI 0 PSI 0 PSI 0 PSI <br /> Tightness Test Results ® Pass ❑ Fail M Pass ❑ Fail M Pass ❑ Fail ® Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.