Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST (continued) <br /> Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> Test Equipment Used: Caldwell Level Change Indicator <br /> Sump/UDC ID UDC 1-2 UDC 3-4 UDC 5-6 <br /> Sump Manufacturer Unknown Unknown Unknown <br /> Sump Depth (inches) 30 30 30 <br /> Sump Bottom to Top of 13 13 13 <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 10:15 AM 10:07 AM 10:00 AM <br /> Initial Reading 1st Ring 1st Ring 1st Ring <br /> Test End Time 10:45 AM 10:37 AM 10:30 AM <br /> Final Reading 1st Ring 1st Ring 1st Ring <br /> Change in Reading 0 0 0 <br /> Pass Fail Criteria 0 0 0 <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 4 of 5 <br />