My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
290
>
2300 - Underground Storage Tank Program
>
PR0231438
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2026 8:09:24 PM
Creation date
4/17/2025 10:54:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231438
PE
2361 - UST FACILITY
FACILITY_ID
FA0003716
FACILITY_NAME
SUPER STOP GAS & LIQUOR*
STREET_NUMBER
290
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22309101
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
290 C N MAIN ST MANTECA 95336
Suite #
C
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of CP22 - UST FULL violations that have not been <br /> addressed for SUPER STOP GAS & LIQUOR* as of September 25, 2025. <br /> Open violations from April 28, 2025 inspection <br /> Violation#56-2030013-DO inspections completed at least every 30 days and meet all requirements(TCR <br /> 12). <br /> OBSERVATION: Designated operator reports were not signed within the required time frame. <br /> -The 11/12 designated operator report was signed by the owner/operator on 12/11. <br /> REGULATORY GUIDANCE:Within 48 hours of the completion of the designated UST operator visual inspection,the <br /> designated operator shall sign and provide the owner or operator with a copy of the inspection report. Within 72 hours <br /> of being provided a signed copy of the report, the owner or operator shall provide a description of each corrective action <br /> taken or to be taken and shall sign and date the report, acknowledging the identified compliance issues. <br /> CORRECTIVE ACTION: Ensure all designated operator inspection reports are completed and signed within the <br /> required time frame in the future. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Des�criibnne actions taken or will be taken tocorrect violation: <br /> Q�XT S U y C. I V� c x 0 �"Y�a o P� E D)1 nip '1 Q _ (�11 (1 �.>n a,l-t <br /> Violation#67-2030078-Owner/Operator retained a paper or electronic copy of the permit to operate at the <br /> facility. <br /> OBSERVATION:A current copy of the UST operating permit was not found on site. The most recent permit on site <br /> was dated 2023. <br /> REGULATION GUIDANCE:A copy of the UST operating permit and all attachments and conditions shall be retained at <br /> the facility. <br /> CORRECTIVE ACTION: Immediately obtain a copy of the 2024 permit and retain it on site. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: -rj' <br /> / <br /> Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.