Laserfiche WebLink
A dOAQU1N Environmental Health Department <br /> COUNTY <br /> CP22 - AST Non-Qualified Inspection Report <br /> Facility Name: Facility Address: Date: <br /> PROFLEET TRUCK LUBE LUBEZONE INC 15453 N THORNTON RD LODI March 11 2025 <br /> 86 4045-Release/Leaks/Spills-General Local Ordinance ❑OUT ❑R ❑COS <br /> 87 See below 4050-Abandonment/Illegal Disposal/Unauthorized Treatment-General ❑OUT ❑R ❑COS <br /> 88 4055-Abandonment/Illegal Disposal/Unauthorized Treatment-General Local Ordinance ❑OUT ❑R ❑COS <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS Il,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 3 Code of Fed Regulations 112.3 4030038-SPCC has been implemented. <br /> OBSERVATION:The Spill Prevention, Control, and Countermeasure(SPCC)Plan was not implemented, as required. <br /> -Section 2.14.3 Briefings--mentions that Oil handling personnel must attend annual discharge prevention <br /> briefings/trainings.Additionally, it also mentions that the topics reviewed and the attendance records are retained in <br /> the facility training records for a minimum of three years. Lee Burdick mentioned that although the employees have <br /> been trained, it does not occur annually and no records were kept. <br /> REGULATION GUIDANCE: 112.3: The owner or operator or an onshore or offshore facility subject to this section must <br /> prepare in writing and implement a Spill Prevention Control and Countermeasure Plan (hereafter"SPCC Plan"or <br /> "Plan")," in accordance with § 112.7 and any other applicable section. 25270.4.5.(a):An owner or operator shall <br /> conduct periodic inspections of the storage tank to ensure compliance with Part 112 (commencing with Section 112.1) <br /> of Subchapter D of Chapter I of Title 40 of the Code of Federal Regulations. In implementing the spill prevention control <br /> and countermeasure plan, an owner or operator shall fully comply with the latest version of the regulations contained in <br /> Part 112 (commencing with Section 112.1)of Subchapter D of Chapter I of Title 40 of the Code of Federal Regulations. <br /> CORRECTIVE ACTION: Implement the SPCC plan, as required. Submit proof of correction to the EHD. <br /> This is (Class 2)Violation. <br /> 11 Code of Fed Regulations 112.7 4010012-SPCC in writing,follows code seq/cross ref, good eng practice, mgt <br /> approval, items not in place. <br /> OBSERVATION :The Spill Prevention, Control, and Countermeasure(SPCC)Plan reviewed at the time of inspection, <br /> dated December 13, 2024, did not follow the order or requirements of 40 CFR Part 112.7. <br /> -> Doesn't follow the required SPCC rule sequence and/or doesn't include adequate cross-reference. <br /> - In Section 3.2.8 Effluent Treatment Facilities, it is mentioned that the oil/water separator system in shown in Figure <br /> 3.Yet when reviewed, Figure 3 did not showcase the location of the 1,500 gallon oil/water separator. <br /> -> It doesn't have the full approval of management at a level of authority to commit the necessary resources to fully <br /> implement the SPCC plan. <br /> -When SPCC was initially reviewed in office,the page titled"Management Approval and Designated Person"was not <br /> signed by management.While on site, Lee Burdick was asked if a signed copy of this page was available and it was <br /> not. Lee then printed the page, reviewed it and signed it. No Further Action needed, this was corrected on site <br /> REGULATION GUIDANCE:40 CFR Part 112.7 If you are the owner or operator of a facility subject to this part you <br /> must prepare a Plan in accordance with good cross-reference.The Plan must have the full approval of management at <br /> a level of authority to commit the necessary resources to fully implement the Plan. <br /> FA0015491 PR0523476 SCO01 03/11/2025 <br /> EHD Rev.12/06/2021 Page 5 of 8 CP22-AST Non-Qualified OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />