Laserfiche WebLink
Hazardous Waste Tank System 2022 <br /> Written Assessment per CCR Title�22Applied Aerospace Structures Inc. outh Airport Way,Stockton,CA 95205 <br /> Project <br /> Tank# �� <br /> Date of Inspection: 1117/A� � <br /> Address: � � 7CA�vl` . <br /> Length: <br /> Width: ,Z, <br /> Height" <br /> Diameter: <br /> Tank Volume: <br /> Secondary Containment Dimensions: <br /> Anchors: 31e tf .of <br /> Hazardous ThrZteri ics of the Waste: �i��Tank Mfg: 51 <br /> Tank System Age: <br /> Design Standard: <br /> Tank Configuration: ✓' t r ` <br /> Material of Construction: �_ f j r7 d <br /> Shell Thickness: (/ -� <br /> Piping Material: <br /> Piping Diameter: v,1 f r / <br /> Pump Discription: P ? _2191 <br /> / <br /> ank Foundation: � '; <br /> Tank Floation., <br /> Tank Frost Heave ,,Lf r '" ` <br /> Tank System Leak Detection: el Tank System Corrosion Protection ui <br /> Tank System overfill and Spill Prevention Equipment: <br /> �cD, <br /> Tank System Secondary Containment: `�' i <br /> Tank System Descrepancies: .�--- ` <br /> System Estimated Remaining Service Life: <br /> Sketc iaack of page: <br /> Strandberg Associates 1(866) 388-0404 john@strandbergassoiates.com <br /> A-9 <br />