My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2800 - Aboveground Petroleum Storage Program
>
PR0516198
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2025 10:08:41 AM
Creation date
5/1/2025 9:57:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0516198
PE
2832 - AST FAC 10 K - </=100 K GAL CUMULATIVE
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1002 FRONTAGE RD RIPON 95366
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gas N Shop <br />1002 Frontage Road, Ripon CA PR0516198 <br />10/21/24 <br /> <br /> <br /> <br />Lynsey Sammons, EHS Page 2 of 79 <br /> <br /> <br />IMG_0437 Liquid level gauge of tank 4 <br />IMG_0438 Tank valve <br />IMG_0439 Tank valve <br />IMG_0440 Liquid level gauge of tank 3 <br />IMG_0441 Tank valve <br />IMG_0442 Interior of south wall of secondary containment <br />IMG_0443 Liquid level gauge of tank 2 <br />IMG_0444 Break in piping within secondary containment <br />IMG_0445 Tank valve <br />IMG_0446 Liquid level gauge of tank 1 <br />IMG_0447 Exterior of north facing wall of secondary containment <br />IMG_0449 Exterior of tanks <br />IMG_0450 Penetration through secondary containment of pipe with open break within containment <br />IMG_0451 Penetration in secondary containment (north wall under AST piping) <br />IMG_0452 Unsigned on-site copy of management approval page <br />IMG_0453 Engineer certification (on-site copy) <br />IMG_0456 On-site copy of plan (figure 2) <br />IMG_0458 On-site copy of plan (3.6-3.7) <br />IMG_0459 On-site copy of plan (figure 3) <br />IMG_0460 On-stie copy of plan (figure 4) <br />IMG_0461 On-site copy of plan (5.0-5.4) <br />IMG_0462 On-site copy of plan (Figure 5) <br />IMG_0463 On-site copy of plan (5.4) <br />IMG_0465 On-site copy of plan (8.7-8.8) <br />IMG_0466 On-site copy of plan (94 continued) <br />IMG_0467 On-site copy of plan (9.0-9.4) <br />IMG_0468 On-site copy of plan (10.0) <br />IMG_0469 On-site copy of plan (11.0-11.1) <br />IMG_0470 Unsigned on-site copy of Substantial Harm Determination <br />IMG_0471 On-site copy of cross-reference table <br />IMG_0472 On-site copy of plan (1.0) <br />IMG_0473 On-site copy of plan (3.8-3.9) <br />IMG_0474 On-site copy of cross-reference table <br />IMG_0475 On-site copy of plan (6.2-6.4) <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.