My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2800 - Aboveground Petroleum Storage Program
>
PR0516198
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2025 10:08:41 AM
Creation date
5/1/2025 9:57:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0516198
PE
2832 - AST FAC 10 K - </=100 K GAL CUMULATIVE
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1002 FRONTAGE RD RIPON 95366
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Health Department <br />CP22 - AST Non-Qualified Inspection Report <br />Date: <br />October 21, 2024 <br /> Facility Address: <br />1002 FRONTAGE RD, RIPON <br /> Facility Name: <br />GAS & SHOP <br />SUMMARY OF VIOLATIONS <br />(CLASS I, CLASS II, or MINOR - Notice to Comply) <br />RemarksItem # <br />Code of Fed Regulations 112.7(a)(3)(i) 4010041 - SPCC Plan addresses the type of oil and storage capacity for all <br />fixed and portable containers. <br />OBSERVATION: The Spill Prevention, Control, and Countermeasure (SPCC) Plan failed to address the type of oil and <br />storage capacity for each fixed container. The storage capacities for AST-1 (diesel fuel), AST-2 (motor oil), and AST-3 <br />(used oil) are out of date. <br />-The storage capacity of AST-1 (diesel fuel) is listed as 10,000-gallons. Manager Erik Sandoval stated that the tank on <br />site at the time of inspection is 15,546-gallons. <br />-The storage capacity of AST-2 (motor oil) and AST-3 (used oil) are listed as 110-gallons each. The tanks observed on <br />site at the time of inspection have a storage capacity of 400-gallons each. <br />REGULATION GUIDANCE: The SPCC plan shall include: (i) The type of oil in each fixed container and its storage <br />capacity. For mobile or portable containers, either provide the type of oil and storage capacity for each container or <br />provide an estimate of the potential number of mobile or portable containers, the types of oil, and anticipated storage <br />capacities. <br />CORRECTIVE ACTION: The SPCC Plan shall properly address the type and storage capacity of all fixed and portable <br />and/or mobile containers, as required. Submit proof of correction to the EHD. <br />This is (Minor) Violation. <br /> 15 <br />Code of Fed Regulations 112.7(a)(3), 25270.4.5(a) 4010015 - SPCC contains an adequate facility diagram. <br />OBSERVATION: The Spill Prevention, Control, and Countermeasure (SPCC) Plan failed to include an adequate facility <br />diagram <br />-The site maps in the SPCC Plan have outdated capacities. <br />-Figure 2, 3, and 4 have AST-1 (diesel fuel) labeled with a storage capacity of 10,000-gallons. Manager Erik Sandoval <br />stated that the tank on site at the time of inspection is 15,546-gallons. <br />-Figure 2 and 3 have AST-2 (motor oil) and AST-3 (used oil) labeled with a storage capacity of 110-gallons each. The <br />tanks observed on site at the time of inspection have a storage capacity of 400-gallons each. <br />REGULATION GUIDANCE: (3) Describe in your Plan the physical layout of the facility and include a facility diagram, <br />which must mark the location and contents of each fixed oil storage container and the storage area where mobile or <br />portable containers are located. The facility diagram must identify the location of and mark as “exempt” underground <br />tanks that are otherwise exempted from the requirements of this part under § 112.1(d)(4). The facility diagram must <br />also include all transfer stations and connecting pipes, including intra-facility gathering lines that are otherwise <br />exempted from the requirements of this part under § 112.1(d)(11). <br />CORRECTIVE ACTION: Ensure that the SPCC plan includes a complete facility diagram. Provide proof of correction to <br />the EHD. <br />This is (Minor) Violation. <br /> 16 <br />EHD Rev. 12/06/2021 <br />FA0000650 PR0516198 SC001 10/22/2024 <br />CP22 - AST Non-Qualified OIRPage 6 of 12 <br />1868 E. Hazelton Avenue | Stockton, California 95205 | T 209 468-3420 | F 209 464-0138 | www.sjgov.org/EHD
The URL can be used to link to this page
Your browser does not support the video tag.