Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared:5/22/2025 <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> UST Monitoring Site Plan <br /> Site Address: SOHAL OIL CHEVRON#3—2494 E FREMONT ST STOCKTON.CA 95205 <br /> . . . _ . . . . . _ . . . . . . . . . . . KEF <br /> . . . . . . . . . . A_AZT%LJ AR <br /> . . . . . . . . _ _ . . . . . . . . . . . F=FELLS <br /> T=TURBINE <br /> XB X B P=PROBE <br /> V_VAPOR <br /> X=SUIEP SENSOR <br /> . . . . . . . . . . _ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . L=Leak Detector <br /> . . . . . . . . . . X.1=manwa3. <br /> B=Brine Sensor <br /> }LB }LB t O I=Smart Sensor <br /> r . S=STP <br /> . . . . . . . . . . . . . . . . . . . . . . . C=Pinata&Clams <br /> X $ B E=EStop <br /> . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . TLD . . . . . . . . . . <br /> . . . . X P S TLD . . . . . . . . . . <br /> B X P S . . . . . . . . <br /> B <br /> : o 0 <br /> . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> .. . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . .. . . . . . . . . . . .. . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . <br /> iPIPL�G+ <br /> . . . . . . . . . . . . . Dravirine of piping <br /> exit of sump and <br /> UDC's.':o <br /> . . . . . . . . undemound <br /> F VNTS <br /> ]� _ B B accurate,NE <br /> g ❑V R - cannot speculate <br /> blue prints. <br /> .A.T,items underground thar are not rrsrble to the certfi-rig technician are a <br /> prglkssronal opinion onh and are sokh'fir r ormarronalpurpaes Draurng <br /> nor ro sraJr <br /> Date map was drawn 5125.211 <br /> Instructions <br /> If you already have a diagram that shows al required information.you may include n.rather than this page,with your Monitoring System Certification. On your site plan. <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment.if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps.dispenser pans,spill containers,or other secondary containment areas.mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the spat*provided,note the date this Site Plan was prepared. <br /> Page 6 of 6 <br />