My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4899
>
2800 - Aboveground Petroleum Storage Program
>
PR0540695
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2025 1:05:50 PM
Creation date
5/22/2025 12:56:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0540695
PE
2831 - AST FAC >/= 1,320 - <10 K GAL CUMULATIVE
FACILITY_ID
FA0017953
FACILITY_NAME
QUALITY FLEET SERVICE CENTER
STREET_NUMBER
4899
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17746022
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4899 S AIRPORT WAY STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Health Department <br />CP22 - AST Non-Qualified Inspection Report <br />Date: <br />April 03, 2025 <br /> Facility Address: <br /> 4899 S AIRPORT WAY, STOCKTON <br /> Facility Name: <br /> QUALITY FLEET SERVICE CENTER <br /> □ OUT □ R □ COS4045 - Release/Leaks/Spills - General Local Ordinance 86 <br /> □ OUT □ R □ COS4050 - Abandonment/Illegal Disposal/Unauthorized Treatment - General See below 87 <br /> □ OUT □ R □ COS4055 - Abandonment/Illegal Disposal/Unauthorized Treatment - General Local Ordinance 88 <br />SUMMARY OF VIOLATIONS <br />(CLASS I, CLASS II, or MINOR - Notice to Comply) <br />RemarksItem # <br />Code of Fed Regulations 112.5(b) 4010009 - 5 year review performed on SPCC and documented. <br />OBSERVATION: The facility failed to perform the 5-year review of the SPCC plan. The Spill Prevention, Control, and <br />Countermeasure (SPCC) Plan was last reviewed on February 2025. SPCC Plan review was due on April 2024. Last <br />Update and review was conducted on April 2019. <br />REGULATION GUIDANCE: (b) Notwithstanding compliance with paragraph [112.5] (a) of this section, complete a <br />review and evaluation of the SPCC Plan at least once every five years from the date your facility becomes subject to <br />this part; or, if your facility was in operation on or before August 16, 2002, five years from the date your last review was <br />required under this part. As a result of this review and evaluation, you must amend your SPCC Plan within six months <br />of the review to include more effective prevention and control technology if the technology has been field -proven at the <br />time of the review and will significantly reduce the likelihood of a discharge as described in § 112.1(b) from the facility. <br />You must implement any amendment as soon as possible , but not later than six months following preparation of any <br />amendment. You must document your completion of the review and evaluation , and must sign a statement as to <br />whether you will amend the Plan, either at the beginning or end of the Plan or in a log or an appendix to the Plan. The <br />following words will suffice, “I have completed review and evaluation of the SPCC Plan for (name of facility) on (date), <br />and will (will not) amend the Plan as a result.” <br />CORRECTIVE ACTION: Immediately complete and document the 5-year review of the SPCC Plan and make any <br />necessary amendments (a Professional Engineer must certify any technical amendments). Submit verification of <br />adequate SPCC plan review completion to the EHD. <br />This is (Minor) Violation. <br /> 10 <br />Code of Fed Regulations 112.7(a)(3)(v) 4010043 - SPCC Plan addresses disposal methods for recovered materials. <br />OBSERVATION: The Spill Prevention, Control, and Countermeasure (SPCC) Plan failed to address disposal methods <br />for recovered materials. The SPCC Plan suggest disposal are to be completed every 180 days however this facility is <br />consider a large quantity generator. <br />REGULATION GUIDANCE: The SPCC plan shall include: (v) Methods of disposal of recovered materials in accordance <br />with applicable legal requirements; <br />CORRECTIVE ACTION: The SPCC Plan shall address all disposal methods for recovered materials. Ensure that the <br />SPCC plan is amended to address disposal for recovered materials in accordance with applicable legal requirements, <br />submit proof of correction to the EHD. <br />This is (Minor) Violation. <br /> 19 <br />Code of Fed Regulations 112.7(b) 4010019 - SPCC predicts direction, rate of flow, total quantity of oil that could be <br />released from a discharge. <br />OBSERVATION: The Spill Prevention, Control, and Countermeasure (SPCC) Plan failed to predict the direction, rate <br />of flow, and the total quantity of the oil that could be discharged for each type of major equipment failure. The potential <br />equipment failure and the resulting spill from 275 gallon tote containing antifreeze was not addressed in the SPCC <br /> 22 <br />FA0017953 PR0540695 SC001 04/03/2025 <br />EHD Rev. 12/06/2021 CP22 - AST Non-Qualified OIRPage 5 of 7 <br />1868 E. Hazelton Avenue | Stockton, California 95205 | T 209 468-3420 | F 209 464-0138 | www.sjgov.org/EHD
The URL can be used to link to this page
Your browser does not support the video tag.