Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 8. IN-TANK GAUGING TESTING <br /> El Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if NO tank gauging equipment is installed. Yes No NA <br /> Do not complete this section if either box is checked. <br /> All wiring has been: 1) visually inspected for kinks, breaks and proper entry and ❑ ❑ ❑ <br /> termination; and 2 tested for ground faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup ❑ ❑ ❑ <br /> to ensure that floats move freely, functionally tested, and confirmed operational? <br /> Was accuracy of system's product level readings tested? ❑ ❑ ❑ <br /> Was accuracy of system's water level readings tested? ❑ ❑ ❑ <br /> Were all probes reinstalled properly? ❑ ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑ I ❑ ❑ <br /> Probe ID Probe Model Tanks Monitored Pass Fail <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ LEI <br /> 9. COMMENTS <br /> Describe all answers marked "No"or "Fail"and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> L - 20 - 91 ANNULAR SPACE SENSOR BROKEN , FOUND CABLE HAD BEEN REPAIRED AND <br /> THE REPAIR CAME APART THE OUTER SKIN CAME OFF. THIS SENSOR WILL NEED TO BE <br /> REPLACED WITH NEW 4 0 9 WRAP AROUND. - REPAIRED AND RETESTED 7/3/24- Zane <br /> Nimmo <br /> DIESEL NORTH PULL CABLE WAS BROKEN PRIOR TO TESTING, REMOVED CABLE AND SLID <br /> SENSOR BACK INTO ANNULAR PORT BACK TO BOTTOM OF TANK ANNULAR. - Fixed on site <br /> and in working order <br /> 87 DRAIN VALVE FAILED ON SPILL BUCKET- Repaired and retested 7/3/24 - Zane Nimmo <br /> Page 5 of 6 <br />