My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4747
>
2300 - Underground Storage Tank Program
>
PR0232482
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 9:07:24 PM
Creation date
6/9/2025 3:57:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0232482
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0003719
FACILITY_NAME
WEST LANE CHEVRON
STREET_NUMBER
4747
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
10437010
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4747 WEST LN STOCKTON 95210
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 5. MONITORING SYSTEM AND PROGRAMMING <br /> A segarafe Monitoring System Certification Form musf be prepared for each control panel. <br /> Wke of Monitoring System Model of Monitoring System Software Version Installed <br /> Control Panel Control Panel <br /> Ve ed er-Root TLS-350 <br /> Attach the post- erf ficatron reports if the monitoring system is capable of generating Yes No NA <br /> either, 0 Monitoring System Set-up M Alarm History Report <br /> All monitoring equipment is operational per rnanufacturers specifications? <br /> Secondary containment systems are free of damage, debris, or liquid? ❑I�' E] <br /> Are the audible and visual alarms operational? ® E) <br /> All sensors have #peen: 1} visually inspected for wiring kinks, breaks and residual on El El <br /> buildup on floats; and ) tested for functionaIityr and confirmed operational? <br /> Are all sensors installed to detect a release at the earliest opportunity in the <br /> secondary containment? <br /> The monitoring system set-up was reviewed, and proper settings confirmed? <br /> Was the monitoring control panel's backup battery visually inspected, functionally ® D El <br /> bested, and confirmed operational? <br /> Does the flow of fuel stop at the dispenser if a release is detected in the under- <br /> dispenser containment? <br /> [does the turbine automatically shut down if the piping secencdaryr containment <br /> monitoring system fails to operate or is electrically disconnected? <br /> Does the turbine automatically shut down if the piping secondary containment <br /> monitoring system detects a release? Which sensors initiate positive shut down? <br /> Check all that apply) Ej Sump M UDC <br /> if monitoring system alarms are relayed to a remote monitoring center, is all <br /> communication equipment operational? <br /> Describe all answer's marked nNo"or"Farb"and proposed remedy in S ecfion 9_ <br /> List all monitoring equipment either replaced or repaired in ,Section 9 <br /> Page 2 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.