Laserfiche WebLink
Revised Workplan-Additional Site Investigation for PFAS BSK Project E20-016-01F <br /> Stockton Metropolitan Airport(SCK) March 1, 2023 <br /> Stockton, California Page 16 <br /> 6.1.1.4 Utility Clearance <br /> Prior to drilling, BSK will conduct the following activities: <br /> 1. Coordinate with SCK personnel and review available site drawings (as made available) to identify <br /> locations of subsurface private utilities. <br /> 2. Mark proposed drilling locations in white paint and notify Underground Services Alert(USA) North to <br /> initiate a ticket for marking of public utilities. Please note that despite required by California <br /> regulations, USA North does not mark on private property unless there is an easement. <br /> 3. Conduct a private utility locating survey with a subcontracted utility locator service. <br /> 4. As required by California regulations, a hand auger will be used to explore the upper 5 ft of each <br /> boring. If deemed necessary by SCK, an air knife rig will be used to excavate a 10-foot deep pilot <br /> boring next to or within any proposed boring locations that may be located in the vicinity of deep <br /> underground utilities. <br /> 6.1.1.5 Site Access and Restrictions <br /> Prior to Site mobilization,a list of BSK field personnel,subcontractor,and vehicles will be provided to SCK <br /> for security and access coordination. Upon arrival each day,the field staff will check in with the SCK Point <br /> of Command (POC) person. Anticipated work hours are between 7:00 AM and 6:00 PM during the work <br /> week. Site personnel will be accompanied by a SCK-approved escort. <br /> 6.1.2 ADVANCEMENT OF BORINGS AND SAMPLE COLLECTION <br /> Drilling activities will be performed by a California C-57 licensed drilling contractor subcontracted by BSK. <br /> Soil borings will include shallow borings for soil sample collection and chemical analysis of subsurface soil <br /> samples (estimated from 10 ft up to 40 ft depth) and deep borings for monitoring well installation and <br /> vertical groundwater sampling (estimated to be >40 ft depth). Borings advanced for subsequent <br /> monitoring well installation, or vertical groundwater sampling, will have soil samples collected for <br /> chemical analysis in the upper 10 ft of the boring (i.e., 1 ft, 5 ft, and 10 ft bgs). Additionally, soil samples <br /> will be collected in three (3) monitoring well borings (e.g., MW-2, MW-3 and MW-4) within the capillary <br /> fringe (approximately 40 ft bgs)to characterize PFAS in the capillary fringe below SCK property. <br /> Shallow soil borings will be advanced using DPT. Monitoring well boreholes will be advanced using a <br /> Hollow Stem Auger (HSA) drilling rig. A Global Positioning Satellite (GPS) device will be used to record <br /> locations of each soil boring. <br />