My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6475
>
2900 - Site Mitigation Program
>
PR0537637
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2026 11:05:14 AM
Creation date
6/23/2025 2:05:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0537637
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0021678
FACILITY_NAME
LINCOLN CENTER ENVIRONMENTAL REMEDIATION TRUST
STREET_NUMBER
6475
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741079
CURRENT_STATUS
Inactive, non-billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
6475 PACIFIC AVE STOCKTON 95207
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l ) <br /> Table 2 <br /> Performance Monitoring Plan <br /> Former Source Area Injection Work Plan <br /> Lincoln Center <br /> Stockton, California <br /> Constituent or Parameter Method MIV-006A, MW-130A-U, NW-130A-L, MIY-131A-U, MIV- <br /> 131A-L, CHMI14-005A, PT-8, and PT-11 <br /> VOCs EPA 8260B <br /> Q Samples will be collected weekly for 4 weeks after injections <br /> Hexavalent Chromium EPA 7196, 7199 and monthly thereafter for two quarters. <br /> Permanganate SM 4500-KMnO4 <br /> Dissolved Iron EPA 6020/200.8 <br /> Dissolved Manganese EPA 6020/200.8 <br /> m <br /> Total Chromium EPA 6020/200.8 Samples will be collected monthly for two quarters <br /> Total Potassium EPA 6020/200.8 <br /> Total Dissolved Solids EPA 160.1 <br /> Groundwater Parameters t Field Measurements Samples will be collected weekly for 4 weeks after injections <br /> and monthly thereafter for two quarters. <br /> Notes: <br /> Pre-injection baseline samples will be collected for Suite A and Suite B constituents and groundwater parameters <br /> t Groundwater parameters include oxidation-reduction potential,electrical conductivity,pH,temperature, and dissolved oxygen.Visual or olfactory <br /> observations including groundwater color(i.e. clear,pink,purple,light brown)and odor will be noted and recorded. Field colorimeter testing for <br /> KMn04 will be conducted. <br /> Geosyntec Consultants,Inc. <br /> 6252019 <br /> 1 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.