Laserfiche WebLink
WELL INSTALLATION AND INTERIM REMEDIAL ACTION REPORT <br />www.arcadis.com <br />FINAL_Forward CHCF (CDCR) Well Installation Report_10182024 <br /> <br />i <br />Well Installation and Interim Remedial Action Report <br />California Department of Corrections and R ehabilitation <br />Austin Road <br />Stockton, California <br /> <br />October 18, 2024 <br /> <br />Prepared By: Prepared For: <br />Arcadis U.S., Inc. Forward, Inc. <br />4119 Broad Street, Suite 210 9999 South Austin Road <br />San Luis Obispo Manteca <br />California 93401 California 95336 <br />Phone: 805 706 2805 <br />Fax: 805 782 9273 <br /> <br />Our Ref: <br />30234731 <br /> <br /> <br />________________________________________ <br />Arianne Terry <br />Project Manager <br /> <br /> <br /> <br /> <br />________________________________________ <br />William Semel, P.E. <br />Principal Engineer <br />California Professional Engineer (C-82542) <br /> <br /> <br /> <br /> <br /> <br />________________________________________ <br />Shawn Roberts, P.G., C.Hg. <br />Senior Hydrogeologist <br />California Professional Geologist (PG-8376) and Hydrogeologist (CHg-904)