Laserfiche WebLink
ITO E RO E K SOP No.004,REv.2 <br /> AssoclATEs,INC SOIL SAMPLING <br /> PAGE 13 <br /> sampler is withdrawn. EnCoreTM samplers or VOA plungers should be filled with soil taken <br /> directly from the tube sampler. Before use, and during storage and transport, the tube <br /> sampler should be capped with a nonreactive material. For physical sampling parameters, <br /> the tube is sealed using plastic caps. The top and bottom of the tube sampler should be <br /> labeled and the tube sampler should be stored accordingly <br /> 2.4.3 Direct-Push Technology Sampler <br /> Geoprobe systems utilize DPT. In many cases, DPT is less expensive and faster than collecting <br /> soil samples with a standard drilling rig. In addition, the use of DPT causes minimal <br /> disturbance to the ground surface and generates little to no soil cuttings. DPT uses acetate <br /> or clear polyvinyl chloride (PVC) sleeves for collecting soil samples. <br /> Upon retrieval of the sampling rod from the ground, the sample sleeve is extruded from the <br /> sampling rod. The sleeve is sliced lengthwise twice, to open the sleeve. Soil samples can be <br /> collected directly from the opened sleeve. If VOA samples are to be collected, EnCoreTM <br /> samplers or VOA plungers should be filled with soil taken directly from the opened DPT <br /> sampler. Samples for other specific chemical analyses should be taken after the VOA sample <br /> has been collected. The remainder of the recovered soil can then be used for visual <br /> classification of the sample and containerized for physical analysis. The entire sample is <br /> retained for analysis or disposal. <br /> 2.5 FIELD QUALITY CONTROL CHECK <br /> Before leaving each sampling site, take time to complete a quality control (QC) check of the <br /> collected samples and documentation.An opportunity to correct any field sampling errors <br /> may not be possible after leaving the site. The QC check should include the following: <br /> • Inspection of all sample containers to determine that no required samples have <br /> been forgotten and an adequate volume of each sample has been collected. <br /> Note: Determining that all required QC samples have been collected is a part of this <br /> inspection (e.g., ambient blanks,trip blanks, duplicates, matrix spike/matrix spike <br /> duplicate (MS/MSD), rinsates, temperature blanks). <br /> • Inspection of all coolers to determine that adequate ice is included and that a <br /> temperature blank has been included in each cooler. <br /> • Inspection of the field log book to determine that all data entries are accurate and <br /> complete. <br />