My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
230
>
2900 - Site Mitigation Program
>
PR0544730
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2026 3:10:16 PM
Creation date
8/12/2025 2:04:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0544730
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0025419
FACILITY_NAME
NESTLE USA INC FORMER NESTLE USA INC FACILITY
STREET_NUMBER
230
STREET_NAME
INDUSTRIAL
STREET_TYPE
AVE
City
RIPON
Zip
95366
APN
25938001
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
230 INDUSTRIAL AVE RIPON 95366
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I ) <br /> I. Introduction <br /> On behalf of Nestle USA, Inc. (Nestle), Haley & Aldrich, Inc. (Haley &Aldrich) has prepared this Rev6ed <br /> Work two forA00fflowl 6`01maqu errs roil Vaporsompling (Work Plan) for the former Nesthi facility <br /> mated m 2301ndustriaI Avenue in Ripon, Cardona (the Site, Figure 1). The original draft or this Warr <br /> Plan, dated 23 May 2019, is the outcome of the following acentdiscussions with California Regional <br /> Water Quality Control Board —Central Valley Region (Water Board) staHregardIng vapor intruson and <br /> a dmtlonal groundwater characterization: <br /> • 24 aff 2019, representatives of Nestle min with the Water Board o recommend <br /> adddaional groundwateraati to further define thein a1z01e an <br /> ands (VUCse ) In oam r north of Wes and area of Highway 99 <br /> (hereafter atoned sthe "North Area" far convenience). 'This Work Plan describes e <br /> empe and methods for addrtional Site i ag furthero characterizegroundwater[ er for <br /> the Noah Area. Water Board staff requested an additional grnndwatar same <br /> groundwatershallow near monitoring wall Ma1A,this work Plan also addresses that <br /> Board staff requested Nestle tormealuate the vapar introvert <br /> pathway rough Water <br /> dditional soil spar sampling. This work Plan addresses the request for <br /> samplingadditional soil and Includes shallow groundwater sampling to further assess <br /> whether apo nt rusiion Issa potential pathway in the Site vicinity. <br /> commentsOn 4fire , Neale received from Water Board staff on the 23 May 2019 Work Plan. The <br /> Work Plan has 9been reamed to add ass Water Board staff comments. AppendHxAincludes NaNe's <br /> response to Water Board staff comments on the 23 May 2619 Work Plan. <br /> IRSICH <br />
The URL can be used to link to this page
Your browser does not support the video tag.