Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ® Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> Test Equipment Used: Caldwell Level Change Indicator <br /> Sump/UDC ID 1-87-PS 2-91-PS 3-Diesel-PS <br /> Sump Manufacturer Western FG Western FG Western FG <br /> Sump Depth (inches) 50" 50 1/2" 50 1/2" <br /> Sump Bottom to Top of 12" 12" 12" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 8:52 8:57 9:02 <br /> Initial Reading .001 .001 .001 <br /> Test End Time 9:22 9:27 9:32 <br /> Final Reading .001 .001 .001 <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria > .002 > .002 > .002 <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> Sump/UDC ID 4-87-FRS 5-91-FRS 6-Diesel-FRS <br /> Sump Manufacturer Western FG Western FG Western FG <br /> Sump Depth (inches) 42 1/2" 41" 42 1/2" <br /> Sump Bottom to Top of 17" 19" 17" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 9:57 10:02 10:07 <br /> Initial Reading .001 .001 .001 <br /> Test End Time 10:27 10:32 10:37 <br /> Final Reading .001 .001 .001 <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria > .002 > .002 > .002 <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />