Laserfiche WebLink
Geosyntec <br /> consultants <br /> TABLE OF CONTENTS <br /> 1. INTRODUCTION................................................................................................ 1 <br /> 2. SITE BACKGROUND......................................................................................... 1 <br /> 3. OBJECTIVES AND SCOPE OF WORK............................................................2 <br /> 4. METHODS........................................................................................................... 3 <br /> 4.1 Notifications and Permitting........................................................................ 3 <br /> 4.2 Destruction of Damaged Monitoring Wells MW-5B and MW-7B............. 3 <br /> 4.3 Installation of Monitoring Wells MW-5C and MW-7C..............................4 <br /> 4.3.1 Borehole Completion......................................................................4 <br /> 4.3.2 Monitoring Well Construction........................................................ 5 <br /> 4.3.3 Monitoring Well Development....................................................... 6 <br /> 4.4 Waste Management and Equipment Cleaning.............................................6 <br /> 4.5 Health and Safety.........................................................................................6 <br /> 5. GROUNDWATER MONITORING PROGRAM...............................................7 <br /> 6. SCHEDULE......................................................................................................... 7 <br /> LIST OF FIGURES <br /> Figure 1: Site Map <br /> Figure 2: Map of Sampling Locations <br /> Figure 3: Monitoring Well Schematic Diagrams <br /> LIST OF APPENDICES <br /> Appendix A: Task Hazard Analysis <br /> OxyChem-Stockton MW Replacement Work Plan 7.18.25 i 2025.07.18 <br />